On this page 6
When a permit is required
Permit triggers and exempt work for Stephens City
A Stephens City zoning permit is required for new construction, additions, accessory structures, interior alterations, pools, and similar work. The Frederick County building permit is then required for code-regulated work under the Virginia USBC.
Note: No separate Stephens City exempt-work list was found. Frederick County and the Virginia USBC control building-permit exemptions. The town may still require zoning review for work inside town limits even when a county building permit is not required. Contact the Town of Stephens City Planning and Zoning office before proceeding.
- Town zoning application materials sufficient to show zoning compliance
- Frederick County permit application
- Plans and construction documents
- Contractor information and Virginia DPOR license if applicable
- Utility, site-plan, or stormwater prerequisites applicable to the project
- Building code
- Building code enforcement is through Frederick County under the 2021 Virginia Uniform Statewide Building Code. Stephens City separately enforces its zoning ordinance and related local approvals.
- Permit validity
- County building permit validity follows Frederick County and USBC rules: void after six months of no activity; renewal required after one year of inactivity.
- Owner-builder
- No separate Stephens City owner-builder rule. Frederick County's owner-contractor rule applies to the county building permit.
- Contractor requirements
- Contractors must hold a valid Virginia DPOR license where required. Stephens City also requires local business licenses for businesses operating in town; business license forms may be submitted to clerk@tosc.us.
Application process
Application → plan check → issuance → inspection → final
- 01 Determine whether the project needs a Stephens City zoning permit, sign permit, temporary-use permit, home-occupation permit, or another town zoning approval.
- 02 For building or construction work, obtain the town zoning permit first. The town requires a zoning permit before applying for a building permit with Frederick County.
- 03 Submit town zoning materials to the Town Office and finalize the application in person. The town states all permits and applications must be finalized at the Town Office to be valid.
- 04 After town zoning approval, submit the building-permit application and construction documents to Frederick County Inspections Department for code review and issuance.
- 05 After permit issuance, Frederick County performs building inspections; the town planner monitors zoning compliance and signs off on certificates of occupancy issued by Frederick County.
Fee schedule
Effective 2025
Town permits and applications must be finalized at the Town Office to be valid. Frederick County fees are due at issuance and accept cash, check, Visa, Mastercard, or Discover with a 2.25% credit-card surcharge.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025) before budgeting.
Required inspections
Scheduling and sequence
- Frederick County online inspection scheduling (online)
- Frederick County Inspections: (540) 665-5650 (phone)
- Inspection hours
- Town Office: Monday through Friday, 8:30 a.m. to 5:00 p.m.
Typical sequence: Town zoning permit first, county building permit second, county code inspections during construction, then town planner signoff on certificates of occupancy issued by Frederick County.
Frequently asked
Common questions about Stephens City permits
01 Do I need a building permit in Stephens City, VA? ▸
02 How much does a building permit cost in Stephens City, VA? ▸
03 How do I apply for a building permit in Stephens City, VA? ▸
04 How do I schedule a building inspection in Stephens City, VA? ▸