When a permit is required
Permit triggers and exempt work for Derby
New construction, additions, alterations, changes of use, demolition, signage, subdivision of land.
- Exempt Routine maintenance and repairs that do not alter footprint, use, or structure
- Exempt Single-family owner-occupied dwellings exempt from DFS state construction permits
Note: Confirm with Zoning Administrator.
- Completed zoning permit application form
- Site plan
- Description of work
- Building code
- 2025 Vermont Fire and Building Safety Code; Derby Zoning Bylaw (January 8, 2024)
- Permit validity
- 2 years from issuance; construction must commence within the permit period.
- Owner-builder
- No state general contractor license required; property owners may act as their own contractor.
- Contractor requirements
- Vermont state electrical and plumbing licenses required for trades.
Application process
Typical processing: Administrative permits typically issued within days to a few weeks. DRB hearings take longer.
- 01 Determine if a zoning permit is required under the Derby Zoning Bylaw (January 8, 2024). Permits are required for new construction, additions, structural alterations, changes of use, demolition, subdivision, and signage within town limits.
- 02 Download the Application for Zoning Permit from https://derbyvt.org/formspermitsapplications/ or pick up at the Town Office at 124 Main Street.
- 03 Complete the application form, including property information, description of work, and required supporting materials (site plan, drawings as applicable).
- 04 Submit to the Zoning Administrator Bob Kelley at 124 Main Street, Derby, VT 05829 during office hours (Mon-Thu 7:00-5:00).
- 05 Pay the applicable permit fee.
- 06 The Zoning Administrator reviews the application. Permitted uses are approved administratively. Applications requiring Development Review Board (DRB) review are scheduled for a public hearing.
- 07 Zoning permits are valid for two years; construction must commence within that period.
- 08 For public buildings, obtain a separate DFS state construction permit.
- 09 For projects with a wastewater system or well, obtain the required DEC permit.
Typical processing time: Administrative permits typically issued within days to a few weeks. DRB hearings take longer.
Fee schedule
Derby building permit fees
Development Review Board appeal fee: $200. Derby Zoning Bylaw contains authoritative fee schedule; contact ZA at (802) 766-2017.
Required inspections
Scheduling and sequence
- Contact Zoning Administrator (phone)
- Inspection hours
- Monday-Thursday 7:00 AM to 5:00 PM; closed Friday
Frequently asked
Common questions about Derby permits
01 Do I need a building permit in Derby, VT? ▸
02 How much does a building permit cost in Derby, VT? ▸
03 How do I apply for a building permit in Derby, VT? ▸
04 How long does it take to get a building permit in Derby, VT? ▸
05 What work is exempt from building permits in Derby, VT? ▸
06 How do I schedule a building inspection in Derby, VT? ▸