When a permit is required
Permit triggers and exempt work for Hardwick
All land development including new construction, additions, alterations, relocations, changes of use, demolitions.
- Exempt Normal maintenance not involving structural changes or change of use
- Exempt Agricultural and forestry practices per state guidelines
- Exempt Other exemptions per the adopted bylaw
Note: Consult ZA for specific exemptions.
- Completed application form
- Site plan
- Fee payment
- Additional documentation for flood hazard area projects
- Building code
- 2025 Vermont Fire and Building Safety Code (DFS for public buildings)
- Permit validity
- Contact ZA for current validity period.
- Owner-builder
- Vermont does not require a GC license; homeowners may self-build.
- Contractor requirements
- State-licensed electricians and plumbers required.
Source: Town of Hardwick, Planning, Zoning, and Floodplain Administration ↗
Application process
Typical processing: Permitted uses: varies, typically 1 to 3 weeks. DRB hearings: scheduled monthly.
- 01 Contact the Zoning Administrator (802-472-1686 or zoning.administrator@hardwickvt.gov) to determine what type of permit is required (permitted use, conditional use, variance, or appeal).
- 02 Obtain the applicable application form from the town website or office.
- 03 Prepare required documents: completed application, site plan, and any other required materials per the application instructions.
- 04 Schedule a site visit with the Zoning Administrator prior to or concurrent with application submission (site visit approval required before application can be approved).
- 05 Submit completed application with the applicable fee (payable to the Town of Hardwick) to the Zoning office.
- 06 ZA reviews the application. Permitted uses: ZA issues permit administratively. Conditional uses / variances: Referred to the Development Review Board for a scheduled public hearing.
- 07 Receive issued permit. Post on job site.
- 08 Schedule any required inspections upon completing work phases.
Typical processing time: Permitted uses: varies, typically 1 to 3 weeks. DRB hearings: scheduled monthly.
Source: Town of Hardwick, Planning, Zoning, and Floodplain Administration ↗
Required inspections
Scheduling and sequence
- 802-472-1686 (phone)
- zoning.administrator@hardwickvt.gov (email)
Typical sequence: ZA may conduct site visits for zoning compliance verification.
Source: Town of Hardwick, Planning, Zoning, and Floodplain Administration ↗
Frequently asked
Common questions about Hardwick permits
01 Do I need a building permit in Hardwick, VT? ▸
02 How do I apply for a building permit in Hardwick, VT? ▸
03 How long does it take to get a building permit in Hardwick, VT? ▸
04 What work is exempt from building permits in Hardwick, VT? ▸
05 How do I schedule a building inspection in Hardwick, VT? ▸