Town of Danville

How to apply for a building permit in Town of Danville, Vermont. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Danville, Zoning Administrator

Street address
36 Rte. 2 West, Danville, VT 05828
Coverage
All land development within the Town of Danville.
§ 02

When a permit is required

Permit triggers and exempt work for Danville

All land development (new construction, additions, alterations, changes of use, subdivision).

Normal maintenance not changing structure, use, or footprint
Agricultural and forestry practices per state guidelines
Other exemptions per adopted zoning bylaw
  • Exempt Normal maintenance not changing structure, use, or footprint
  • Exempt Agricultural and forestry practices per state guidelines
  • Exempt Other exemptions per adopted zoning bylaw

Note: Confirm with ZA for specific exemptions.

Required documents
  • Completed application form
  • Site plan
  • Fee
Building code
2025 Vermont Fire and Building Safety Code (DFS for public buildings)
Permit validity
Contact ZA; Vermont standard practice is 2 years.
Owner-builder
No GC license required; state-licensed electricians and plumbers required.
Contractor requirements
State-licensed electricians and plumbers required.

Source: Town of Danville, Zoning Administrator ↗

§ 03

Application process

Typical processing: Permitted uses: typically 1 to 2 weeks. DRB hearings: per published schedule.

  1. 01
    Review the Danville Zoning Permit Guide (available at the link above) to determine if a permit is required and which type.
  2. 02
    Contact the Zoning Administrator at 802-684-3426 ext. 204 or zoning@danvillevt.gov with any questions about requirements.
  3. 03
    Obtain and complete the applicable application form.
  4. 04
    Prepare a site plan and any additional supporting documents required.
  5. 05
    Submit complete application with fee to the Zoning Administrator.
  6. 06
    ZA reviews for compliance; permitted uses approved administratively. Projects requiring DRB review are scheduled for a public hearing.
  7. 07
    Receive permit upon approval; post on job site.

Typical processing time: Permitted uses: typically 1 to 2 weeks. DRB hearings: per published schedule.

Source: Town of Danville, Zoning Administrator ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • 802-684-3426 ext. 204 (phone)
  • zoning@danvillevt.gov (email)

Typical sequence: ZA conducts site visits for zoning compliance as needed.

Source: Town of Danville, Zoning Administrator ↗

§ 05

Frequently asked

Common questions about Danville permits

01 Do I need a building permit in Danville, VT?
All land development (new construction, additions, alterations, changes of use, subdivision).
02 How do I apply for a building permit in Danville, VT?
To apply for a building permit in Danville, VT, follow these steps: 1. Review the Danville Zoning Permit Guide (available at the link above) to determine if a permit is required and which type. 2. Contact the Zoning Administrator at 802-684-3426 ext. 204 or zoning@danvillevt.gov with any questions about requirements. 3. Obtain and complete the applicable application form. 4. Prepare a site plan and any additional supporting documents required. 5. Submit complete application with fee to the Zoning Administrator. 6. ZA reviews for compliance; permitted uses approved administratively. Projects requiring DRB review are scheduled for a public hearing. 7. Receive permit upon approval; post on job site.
03 How long does it take to get a building permit in Danville, VT?
Building permit processing times in Danville, VT typically run Permitted uses: typically 1 to 2 weeks. DRB hearings: per published schedule.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Danville, VT?
Not all construction work requires a permit in Danville, VT. The following work is generally exempt: Normal maintenance not changing structure, use, or footprint; Agricultural and forestry practices per state guidelines; Other exemptions per adopted zoning bylaw. Note: Confirm with ZA for specific exemptions. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Danville, VT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Danville, VT via: 802-684-3426 ext. 204, zoning@danvillevt.gov.
last verified April 2026 source Town of Danville, Zoning Administrator ↗ entry id permits/vermont/caledonia/danville