City of Chester

How to apply for a building permit in City of Chester, Utah. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Utah 2021 statewide code package under Title 15A.
Avg processing
Varies. Contact county at 435-835-2113.
Last verified
April 2026
On this page 5
§ 01

Permit authority

Chester Town -- local planning and zoning (small town with limited public web presence); Sanpete County Building Department (building permit issuance)

Coverage
Chester building permits are handled by the Sanpete County Building Department. Contact the Sanpete County Zoning Office for local zoning compliance requirements applicable to Chester.
§ 02

When a permit is required

Permit triggers and exempt work for Chester

All construction over 200 sq. ft. (within Chester town limits) or over 120 sq. ft. (in areas that follow unincorporated county thresholds) requires a Sanpete County building permit.

Accessory structures of 200 sq. ft. or smaller (or 120 sq. ft. if subject to unincorporated county rules confirm applicable threshold with county).
Agricultural buildings that are strictly for agricultural use may qualify for an exemption (agricultural exemption form required see Sanpete County section).
Utah IRC/IBC baseline exemptions apply for other categories.
  • Exempt Accessory structures of 200 sq. ft. or smaller (or 120 sq. ft. if subject to unincorporated county rules confirm applicable threshold with county).
  • Exempt Agricultural buildings that are strictly for agricultural use may qualify for an exemption (agricultural exemption form required see Sanpete County section).
  • Exempt Utah IRC/IBC baseline exemptions apply for other categories.
Required documents
  • Permit validity/expiration: County building permit expires if work does not commence within 180 days.
  • Ownerbuilder rules: Utah statewide ownerbuilder rules apply.
  • Contractor license requirements: Utah DOPL licensure required for work valued at $3,000 or more.
  • Building code adopted: Utah 2021 statewide code package under Title 15A.
Building code
Utah 2021 statewide code package under Title 15A.
Permit validity
County building permit expires if work does not commence within 180 days.
Owner-builder
Utah statewide owner-builder rules apply.
Contractor requirements
Utah DOPL licensure required for work valued at $3,000 or more.
§ 03

Application process

Typical processing: Varies. Contact county at 435-835-2113.

  1. 01
    Contact the Sanpete County Building Department at 435-835-2113 and the Planning and Zoning office at 435-835-2115 to confirm Chester-specific local requirements and any applicable zoning clearances.
  2. 02
    Register for a CityInspect account and submit the building permit application with all required plans and documents.
  3. 03
    Obtain WUI clearance from the county if the project is in or near the WUI zone.
  4. 04
    Pay applicable county fees.
  5. 05
    Receive the county building permit, post it on-site, and schedule inspections through the county.

Typical processing time: Varies. Contact county at 435-835-2113.

Source: Chester Town -- local planning and zoning (small town with limited public web presence); Sanpete County Building Department (building permit issuance) ↗

§ 04

Fee schedule

Chester building permit fees

Fee type
Amount
01
Reinspection fee
Not clearly published. Contact county.
§ 05

Frequently asked

Common questions about Chester permits

01 Do I need a building permit in Chester, UT?
All construction over 200 sq. ft. (within Chester town limits) or over 120 sq. ft. (in areas that follow unincorporated county thresholds) requires a Sanpete County building permit.
02 How do I apply for a building permit in Chester, UT?
To apply for a building permit in Chester, UT, follow these steps: 1. Contact the Sanpete County Building Department at 435-835-2113 and the Planning and Zoning office at 435-835-2115 to confirm Chester-specific local requirements and any applicable zoning clearances. 2. Register for a CityInspect account and submit the building permit application with all required plans and documents. 3. Obtain WUI clearance from the county if the project is in or near the WUI zone. 4. Pay applicable county fees. 5. Receive the county building permit, post it on-site, and schedule inspections through the county.
03 How long does it take to get a building permit in Chester, UT?
Building permit processing times in Chester, UT typically run Varies. Contact county at 435-835-2113.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Chester, UT?
Not all construction work requires a permit in Chester, UT. The following work is generally exempt: Accessory structures of 200 sq. ft. or smaller (or 120 sq. ft. if subject to unincorporated county rules confirm applicable threshold with county).; Agricultural buildings that are strictly for agricultural use may qualify for an exemption (agricultural exemption form required see Sanpete County section).; Utah IRC/IBC baseline exemptions apply for other categories.. When in doubt, confirm with the local building department before starting work.

Educational reference. Permit rules and fees change — confirm current requirements directly with Chester Town -- local planning and zoning (small town with limited public web presence); Sanpete County Building Department (building permit issuance) before applying. Jaspector is not legal advice.