On this page 5
When a permit is required
Permit triggers and exempt work for Fielding Town
Regulated construction in Fielding requires permits per the adopted 2021 IBC/IRC and local ordinances.
Note: Based on 2021 IRC/IBC statewide baseline exemptions. Confirm with Fielding Town at 435-458-3682.
- Building code
- 2021 IBC, 2021 IRC, NEC, and related codes as adopted statewide
- Owner-builder
- Utah statewide DOPL rules apply
- Contractor requirements
- Utah DOPL licensing required
Application process
Application → plan check → issuance → inspection → final
- 01 Contact Fielding Town at 435-458-3682 or info@fieldingtown.org to confirm current building permit requirements and whether permits are processed through the town or coordinated with Box Elder County Building Permits / Inspection.
- 02 Obtain and complete the applicable permit application.
- 03 Submit required plans and documents.
- 04 Pay permit fees.
- 05 Receive permit and schedule inspections.
Source: Fielding Town Office ↗
Required inspections
Scheduling and sequence
- 435-458-3682 (Fielding Town) (phone)
- 435-734-2634 (Box Elder County Building Permits) (phone)
Source: Fielding Town Office ↗
Frequently asked
Common questions about Fielding Town permits
01 Do I need a building permit in Fielding Town, UT? ▸
02 How do I apply for a building permit in Fielding Town, UT? ▸
03 How do I schedule a building inspection in Fielding Town, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Fielding Town Office before applying. Jaspector is not legal advice.