jaspector
City building permits

Brigham City

How to apply for a building permit in Brigham City, Utah. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Brigham City Community and Economic Development Department, Building Division

Street address
20 North Main Street, 2nd Floor, Brigham City, UT 84302
Coverage
All properties within the incorporated limits of Brigham City, Utah. Brigham City is the county seat of Box Elder County and issues its own building permits independently of the county building department.
Online portal
Brigham City Building Permits and Inspections
City website with online application forms
§ 02

When a permit is required

Permit triggers and exempt work for Brigham City

A building permit is required for the construction, addition, alteration, repair, demolition, or change of occupancy of any building or structure within Brigham City, in accordance with the adopted building codes. Permits are also required for mechanical, plumbing, and electrical work beyond minor repairs.

Wallpapering, painting, tiling, carpeting, cabinets, countertops, and similar interior finish work
Placement of flat concrete work such as a driveway or concrete patio (at grade)
Complying agricultural buildings (permit fee is waived, but a permit and inspections are still required)
One-story detached accessory structures under 200 sq ft without utilities (statewide IRC baseline; confirm with Brigham City for any local restrictions)
Fences not over 7 ft in height
Retaining walls not over 4 ft in height not supporting a surcharge
  • Exempt Wallpapering, painting, tiling, carpeting, cabinets, countertops, and similar interior finish work
  • Exempt Placement of flat concrete work such as a driveway or concrete patio (at grade)
  • Exempt Complying agricultural buildings (permit fee is waived, but a permit and inspections are still required)
  • Exempt One-story detached accessory structures under 200 sq ft without utilities (statewide IRC baseline; confirm with Brigham City for any local restrictions)
  • Exempt Fences not over 7 ft in height
  • Exempt Retaining walls not over 4 ft in height not supporting a surcharge

Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm with Brigham City Community and Economic Development before proceeding.

Required documents
  • Completed building permit application
  • Site plan (showing property boundaries, existing and proposed structures, setbacks)
  • Construction drawings (floor plans, elevations, sections, foundation plan)
  • Energy code compliance documentation
  • Structural engineering where required
  • Any trade-specific applications (electrical, plumbing, mechanical)
Building code
Utah State Construction Code: 2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IECC, NEC. Building Chapter 150 of Brigham City Code governs building regulations locally.
Permit validity
Applications and issued permits are subject to Utah code-based expiration rules. Confirm current validity period with the Building Division.
Owner-builder
Owner-builders must comply with Utah DOPL statewide rules. Brigham City requires applicable disclosure forms.
Contractor requirements
All contractors must hold valid Utah DOPL contractor licenses for regulated trade work. A current Brigham City business license may also be required for contractors working in the city.

Source: Brigham City Community and Economic Development Department, Building Division ↗

§ 03

Application process

Typical processing: Residential: 3-5 business days; Commercial: approximately 5-10 business days. Timing varies by project complexity and submittal completeness.

  1. 01
    Determine the project type (new single-family dwelling, addition/remodel, commercial, etc.) and download the applicable information sheet or application from the Brigham City website.
  2. 02
    Complete the building permit application form. Permit applications are available at City Hall (2nd Floor, 20 N Main St) and online on the city website.
  3. 03
    Prepare required plans and supporting documents per the department's requirements for the project type.
  4. 04
    Submit the application and plans to Brigham City Community and Economic Development, 2nd Floor, 20 N Main Street, or via online submission where available.
  5. 05
    Staff will review for zoning compliance, building code compliance, and other applicable requirements.
  6. 06
    Pay permit fees once the permit is approved. The cost is based on project valuation, calculated using National Building Standards valuation data.
  7. 07
    Receive the issued permit; post on site.
  8. 08
    Schedule all required inspections during construction by calling 435-734-6604 at least 24 hours before the requested inspection time.

Typical processing time: Residential: 3-5 business days; Commercial: approximately 5-10 business days. Timing varies by project complexity and submittal completeness.

Source: Brigham City Community and Economic Development Department, Building Division ↗

§ 04

Fee schedule

Brigham City building permit fees

Fee type
Amount
01
Plan check fee
Up to 50% of the building permit fee for residential; up to 65% of the building permit fee for commercial
02
Permit fee formula
Fees are based on the valuation of the project. Valuation is calculated using per-square-foot costs published by the National Building Standards (ICC Building Valuation Data table, updated periodically).
03
Reinspection fee
Not separately published on the reviewed page; confirm with the Building Division

Fees change periodically. Verify current amounts directly with Brigham City Community and Economic Development before applying.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 435-734-6604 (phone)
Scheduling deadline
At least 24 hours before the requested inspection time
Inspection hours
Monday-Friday, 8:00 AM to 5:00 PM

Typical sequence: Typical sequence: Foundation / footing; Rough trades (mechanical, plumbing, electrical) -- framing open; Framing inspection; Insulation inspection; Drywall / sheetrock (if required); Final inspection (all trades, life safety, energy compliance); Certificate of Occupancy

Source: Brigham City Community and Economic Development Department, Building Division ↗

§ 06

Frequently asked

Common questions about Brigham City permits

01 Do I need a building permit in Brigham City, UT?
A building permit is required for the construction, addition, alteration, repair, demolition, or change of occupancy of any building or structure within Brigham City, in accordance with the adopted building codes. Permits are also required for mechanical, plumbing, and electrical work beyond minor repairs.
02 How much does a building permit cost in Brigham City, UT?
Building permit fees in Brigham City, UT are set by the local building department and vary by project type and valuation. Fees are calculated as: Fees are based on the valuation of the project. Valuation is calculated using per-square-foot costs published by the National Building Standards (ICC Building Valuation Data table, updated periodically).. Plan check fee: Up to 50% of the building permit fee for residential; up to 65% of the building permit fee for commercial.
03 How do I apply for a building permit in Brigham City, UT?
To apply for a building permit in Brigham City, UT, follow these steps: 1. Determine the project type (new single-family dwelling, addition/remodel, commercial, etc.) and download the applicable information sheet or application from the Brigham City website. 2. Complete the building permit application form. Permit applications are available at City Hall (2nd Floor, 20 N Main St) and online on the city website. 3. Prepare required plans and supporting documents per the department's requirements for the project type. 4. Submit the application and plans to Brigham City Community and Economic Development, 2nd Floor, 20 N Main Street, or via online submission where available. 5. Staff will review for zoning compliance, building code compliance, and other applicable requirements. 6. Pay permit fees once the permit is approved. The cost is based on project valuation, calculated using National Building Standards valuation data. 7. Receive the issued permit; post on site. 8. Schedule all required inspections during construction by calling 435-734-6604 at least 24 hours before the requested inspection time.
04 How long does it take to get a building permit in Brigham City, UT?
Building permit processing times in Brigham City, UT typically run Residential: 3-5 business days; Commercial: approximately 5-10 business days. Timing varies by project complexity and submittal completeness.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Brigham City, UT?
Not all construction work requires a permit in Brigham City, UT. The following work is generally exempt: Wallpapering, painting, tiling, carpeting, cabinets, countertops, and similar interior finish work; Placement of flat concrete work such as a driveway or concrete patio (at grade); Complying agricultural buildings (permit fee is waived, but a permit and inspections are still required); One-story detached accessory structures under 200 sq ft without utilities (statewide IRC baseline; confirm with Brigham City for any local restrictions); Fences not over 7 ft in height; Retaining walls not over 4 ft in height not supporting a surcharge. Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm with Brigham City Community and Economic Development before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Brigham City, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Brigham City, UT via: 435-734-6604. At least 24 hours before the requested inspection time.
last verified April 2026 source Brigham City Community and Economic Development Department, Building Division ↗ entry id permits/utah/box-elder/brigham-city

Educational reference. Permit rules and fees change — confirm current requirements directly with Brigham City Community and Economic Development Department, Building Division before applying. Jaspector is not legal advice.