When a permit is required
Permit triggers and exempt work for Minersville
Any owner or authorized agent intending to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, alter, or replace any electrical, gas, mechanical, or plumbing system must first obtain the required permit.
- Exempt Structures up to 200 square feet without electricity
- Exempt Fences not over 7 feet high
- Exempt Retaining walls not over 4 feet in height not supporting surcharge
- Exempt Ordinary repairs and maintenance not involving structural, mechanical, electrical, or plumbing changes
- Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
- Exempt Prefabricated swimming pools less than 24 inches deep
- Exempt One-story detached accessory structures with floor area not exceeding 200 square feet and no electrical
Note: Same as unincorporated Beaver County; contact building department before treating work as exempt
- Completed building permit application
- Two full sets of construction plans per Beaver County Building Plan Requirements
- Owner-Builder and Inspection Notice Form (if owner-builder)
- Utah DOPL contractor license information (if licensed contractor)
- Wastewater/septic permit (if not on public sewer)
- Structural engineer stamp (if applicable)
- Building code
- 2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IECC, and current NEC, as adopted statewide under Utah Title 15A and enforced by the Beaver County Building Official; local ordinances referenced at Minersville Town Code of Ordinances
- Permit validity
- Default IRC/IBC standard (180 days without commencement or ongoing activity) applies; confirm with county building official or Minersville Town Hall
- Owner-builder
- Same statewide rules apply (Utah Code Section 58-55-305); 2025 Owner-Builder and Inspection Notice Form required and forwarded to dopltech@utah.gov per state requirements
- Contractor requirements
- Utah DOPL state contractor license required
Source: Minersville Town (building inspections contracted to Beaver County Building Department) ↗
Application process
Typical processing: Usually approved within 14 business days if all required items are submitted
- 01 Confirm project is within Minersville Town limits.
- 02 Contact Minersville Town Hall at 435-386-2242 regarding local zoning, land use, and any municipal requirements.
- 03 Review Minersville Town Code of Ordinances for local building and zoning requirements.
- 04 Arrange wastewater/septic permits if not on public sewer.
- 05 Prepare two complete sets of construction plans per Beaver County Building Plan Requirements.
- 06 Download and complete building permit application from Beaver County Permits page; if using owner-builder exemption, also complete 2025 Owner-Builder and Inspection Notice Form.
- 07 Submit application and plan sets to Beaver County Building Department at 105 East Center Street, Beaver, UT 84713 (in person or by mail to P.O. Box 1013); confirm with Minersville Town Hall whether any documents must also be submitted locally.
- 08 Pay applicable permit fees; confirm fee payment procedures with Minersville Town Hall and county building department.
- 09 Post approved permit at the job site.
- 10 Schedule required inspections through Beaver County Building Department at 435-438-6484 with at least 24 hours advance notice (if Monday inspection needed, call by prior Friday).
Typical processing time: Usually approved within 14 business days if all required items are submitted
Source: Minersville Town (building inspections contracted to Beaver County Building Department) ↗
Required inspections
Scheduling and sequence
- 435-438-6484 (phone)
- Scheduling deadline
- 24 hours minimum advance notice required; if Monday inspection needed, call by prior Friday
- Inspection hours
- Monday through Thursday 7:00 a.m. to 4:00 p.m.
Typical sequence: Same as unincorporated Beaver County: Interior/Exterior Spot Footings, Foundations, Underground Electrical and Plumbing, Framing, Rough Plumbing, Rough Electrical, Rough Mechanical, Insulation, Weather Resistive Barrier and Flashing, Drywall/Firewall, Shower Pan, Exterior, Gas Piping, Electrical Service Panel, Final Inspection. Certificate of Occupancy requires all inspections passed.
Source: Minersville Town (building inspections contracted to Beaver County Building Department) ↗
Frequently asked
Common questions about Minersville permits
01 Do I need a building permit in Minersville, UT? ▸
02 How do I apply for a building permit in Minersville, UT? ▸
03 How long does it take to get a building permit in Minersville, UT? ▸
04 What work is exempt from building permits in Minersville, UT? ▸
05 How do I schedule a building inspection in Minersville, UT? ▸