jaspector
§ TX Wise County
City building permits

City of Decatur

How to apply for a building permit in City of Decatur, Texas. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Development Services, City of Decatur

Street address
1601 S State St., Decatur, TX 76234
Coverage
Applies within Decatur city limits.
Online portal
GovWell
GovWell
§ 02

When a permit is required

Permit triggers and exempt work for Decatur

Permits are required for work regulated by the adopted building codes within Decatur city limits.

Required documents
  • Electronic permit application
  • Contractor registration
  • Plans/documents required for the selected permit type
Building code
Effective January 1, 2025: 2021 IBC, IRC, IMC, IFC, IECC, IFGC, IEBC, ISPSC, IPC, 2023 NEC, and NCTCOG amendments.
Contractor requirements
Contractors must complete the contractor registration process before online permit use.
§ 03

Application process

Typical processing: City review timeframes page lists 7 business days for residential and 7 business days for commercial building permits. Inspection requests called in before 3:30 PM are scheduled for the following business day.

  1. 01
    Visit GovWell at https://app.govwelltech.com/decatur.
  2. 02
    Create an account.
  3. 03
    Complete contractor registration.
  4. 04
    Select the needed building permit application and submit electronically.
  5. 05
    Respond to review comments and pay fees in GovWell.
  6. 06
    After issuance, schedule inspections in GovWell or by calling the inspection line.

Typical processing time: City review timeframes page lists 7 business days for residential and 7 business days for commercial building permits. Inspection requests called in before 3:30 PM are scheduled for the following business day.

Source: Development Services, City of Decatur ↗

§ 04

Fee schedule

Effective November 1, 2025

Fee type
Amount
01
Minimum permit fee
$100 for residential permits if no square footage is involved
02
Plan check fee
Included in city fee ordinance, but not fully exposed in searchable snippet reviewed.
03
Permit fee formula
Mixed. New-construction building permits at $0.94 per square foot under Ordinance 2025-11-43, with other permit categories in the city fee schedule ordinance.

Online features in GovWell include paying fees.

Fees change periodically. Confirm at the official fee schedule ↗ (effective November 1, 2025) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Requests called in prior to 3:30 PM are scheduled for the following business day.

Typical sequence: Various inspections are required during construction up to final certificate of occupancy.

§ 06

Frequently asked

Common questions about Decatur permits

01 Do I need a building permit in Decatur, TX?
Permits are required for work regulated by the adopted building codes within Decatur city limits.
02 How much does a building permit cost in Decatur, TX?
Building permit fees in Decatur, TX are set by the local building department and vary by project type and valuation. The minimum permit fee is $100 for residential permits if no square footage is involved. Fees are calculated as: Mixed. New-construction building permits at $0.94 per square foot under Ordinance 2025-11-43, with other permit categories in the city fee schedule ordinance.. Plan check fee: Included in city fee ordinance, but not fully exposed in searchable snippet reviewed..
03 How do I apply for a building permit in Decatur, TX?
To apply for a building permit in Decatur, TX, follow these steps: 1. Visit GovWell at https://app.govwelltech.com/decatur. 2. Create an account. 3. Complete contractor registration. 4. Select the needed building permit application and submit electronically. 5. Respond to review comments and pay fees in GovWell. 6. After issuance, schedule inspections in GovWell or by calling the inspection line.
04 How long does it take to get a building permit in Decatur, TX?
Building permit processing times in Decatur, TX typically run City review timeframes page lists 7 business days for residential and 7 business days for commercial building permits. Inspection requests called in before 3:30 PM are scheduled for the following business day.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Decatur, TX?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Decatur, TX via: GovWell, (940) 393-0259. Requests called in prior to 3:30 PM are scheduled for the following business day..
last verified April 2026 source Development Services, City of Decatur ↗ entry id permits/texas/wise/decatur

Educational reference. Permit rules and fees change — confirm current requirements directly with Development Services, City of Decatur before applying. Jaspector is not legal advice.