On this page 6
When a permit is required
Permit triggers and exempt work for Big Sandy
A building permit is required before new construction, demolition, remodeling, or installation of a structure within the corporate city limits.
- Completed application
- Legal description
- Contractor information
- Valuation of work
- Two complete scaled plan sets including site-plat, floor, foundation, elevation, and drainage plans
- Building code
- The city code contains building, plumbing, and electrical adoption sections, but the current public sources reviewed did not clearly state the current adopted edition for the building code set. Applicants should confirm the currently enforced code editions with City Hall.
- Contractor requirements
- The reviewed public pages did not show a general contractor registration program. State licensing still applies to regulated trades. Big Sandy's code also contains separate electrical licensing provisions.
Application process
Typical processing: Up to 30 days for review and/or approval
- 01 Before starting new construction, demolition, remodeling, or installation of a structure in city limits, complete the city building permit application.
- 02 Prepare the required package. The application instructions require all application questions to be completed and require an accurate legal description, contractor information, valuation, and two complete plan sets drawn to scale.
- 03 Required plans include a site or plat plan, floor plan, foundation plan, elevation plan for all four sides, and a drainage plan.
- 04 Submit the original signed application to the City Secretary during City Hall business hours.
- 05 The application is reviewed by the Mayor, Public Works Director, and/or the City of Big Sandy Zoning Commission.
- 06 If approved, pay the applicable fees and obtain the permit before work starts. Inspections are then arranged with the city.
Typical processing time: Up to 30 days for review and/or approval
Fee schedule
Big Sandy building permit fees
Permit issuance upon payment of applicable fees at City Hall. No public online permit payment workflow was identified.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Inspection hours
- 7:30 a.m. to 12:00 p.m. and 1:00 p.m. to 4:30 p.m. Monday through Friday
Frequently asked
Common questions about Big Sandy permits
01 Do I need a building permit in Big Sandy, TX? ▸
02 How much does a building permit cost in Big Sandy, TX? ▸
03 How do I apply for a building permit in Big Sandy, TX? ▸
04 How long does it take to get a building permit in Big Sandy, TX? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Big Sandy / City Secretary before applying. Jaspector is not legal advice.