When a permit is required
Permit triggers and exempt work for Schleicher County
No general county building permit program for ordinary vertical construction identified. Permits required for: OSSF/septic construction, alteration, repair, extension, and operation; county-road pipeline or utility crossings; new county-road access driveways requiring ditch work and/or culvert installation; and subdivision activity.
- Exempt OSSF systems meeting the 10-acre rule
- Exempt Certain emergency repairs not requiring permit if reported in writing within 72 hours after repairs have begun
- OSSF: application and planning materials with site evaluation by TCEQ licensed site evaluator or professional engineer
- Pipeline/utility crossing: county application, road location, description and location details, and map; signed policy required
- Access driveway: county permit form with project details and sketch/design information
- Subdivision: compliance with posted county subdivision regulations
- Building code
- TCEQ OSSF rules under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285 apply. County right-of-way policies for access driveways and pipeline/utility crossings and county subdivision regulations also apply. No general county building code adoption identified.
- Permit validity
- OSSF: authorization to construct valid for one calendar year from issuance. Pipeline/utility crossing: valid for 90 days, subject to extension. Access driveway: becomes null and void if not constructed within six months from issuance.
- Owner-builder
- OSSF: owner may install OSSF for single-family dwelling the owner owns on property the owner owns if local requirements allow and state conditions are met.
- Contractor requirements
- OSSF installers, site evaluators, and related personnel governed by state licensing rules under TCEQ OSSF program.
Application process
Typical processing: OSSF: TCEQ requires approval or denial within 30 days of receipt. No public processing-time estimate for subdivision, driveway, or pipeline permits.
- 01 Verify the parcel is in unincorporated Schleicher County and outside Eldorado city limits.
- 02 Determine whether the project triggers one of the county's published permit programs: subdivision regulations, county-road pipeline/utility crossing permits, county-road access driveway permits, or OSSF/septic permitting.
- 03 For OSSF/septic work, contact the Schleicher County Authorized Agent and submit planning and permit application materials required by TCEQ and the local authorized-agent program.
- 04 For a county-road pipeline or utility crossing, submit the county application identifying the road location, include required map/location description. Form states $500 permit fee, requires 8-1-1 confirmation, and requires notification 48 hours prior to installation.
- 05 For a county-road access driveway, submit the driveway permit form and design sketch. All construction and materials are subject to county inspection and approval.
- 06 For subdivision activity, comply with the county subdivision regulations before proceeding.
- 07 Wait for approval before beginning the covered work.
- 08 Complete required inspection steps: OSSF work subject to permitting-authority review and inspection; driveway applicants must contact county at least 24 hours before work begins; pipeline applicants must give 48 hours notice before installation.
Typical processing time: OSSF: TCEQ requires approval or denial within 30 days of receipt. No public processing-time estimate for subdivision, driveway, or pipeline permits.
Required inspections
Scheduling and sequence
- OSSF: (325) 456-4607 (phone)
- Access driveway: contact county representative at least 24 hours prior to beginning work (in-person)
- Pipeline/utility crossing: notification 48 hours prior to installation and 8-1-1 service confirmation required (phone)
- Inspection hours
- OSSF office hours: Monday through Friday, 9AM - 12PM and 1PM - 5PM
Typical sequence: OSSF: submit permit materials, receive approval, install system, request inspection at least five working days before system ready, obtain final approval if system passes. Access driveway: submit permit, receive authorization, notify county before work, complete work subject to county inspection. Pipeline/utility crossing: submit application, obtain approval, give 48 hours notice, perform installation subject to county policy conditions.
Frequently asked
Common questions about unincorporated Schleicher County permits
01 Do I need a building permit in unincorporated Schleicher County, TX? ▸
02 How do I apply for a building permit in unincorporated Schleicher County, TX? ▸
03 How long does it take to get a building permit in unincorporated Schleicher County, TX? ▸
04 What work is exempt from building permits in unincorporated Schleicher County, TX? ▸
05 How do I schedule a building inspection in unincorporated Schleicher County, TX? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Schleicher County Commissioners Court / County Offices; Schleicher County Authorized Agent for OSSF before applying. Jaspector is not legal advice.