When a permit is required
Permit triggers and exempt work for Silsbee
Any person, firm, corporation, or agent who desires to erect, construct, alter, move, or demolish any building or structure, including signs, must first make application and obtain the required permit before commencing. Separate plumbing, electrical, and mechanical permits are required if that work is performed.
- Permit application
- Drawings/specifications if required
- Plot diagram
- Named and registered third-party inspectors when required
- Energy code compliance submittals
- Trade-specific information
- Contractor details and license details on trade permit forms
- Building code
- City permit materials cite 2015 International Building Codes, 2015 IECC, and 2014 NEC in the permit procedure. Newer permit applications cite 2018 IRC, 2018 IBC, and 2018 IMC/Fuel Gas sections. The currently controlling edition should be confirmed with the city before filing.
- Owner-builder
- Owners may call for inspections. The city procedure states contractors or owners are responsible for calling inspections.
- Contractor requirements
- Trade permit forms require contractor license numbers where applicable. Mechanical permit form requires contractor state license number. The permits page includes a contractor registration form.
Application process
Typical processing: Ordinarily within 48 hours unless modifications are required; commercial structures ordinarily within one week unless modifications are required.
- 01 Download the applicable permit form from the city permits page and complete owner, contractor, project, and site information.
- 02 Provide drawings and specifications if required by the Building Official. The city procedure states two copies of specifications and scaled drawings may be required, with enough clarity and detail to describe the work.
- 03 Provide a plot diagram showing the proposed structure, existing structures, dimensions to property lines, and clearly identified property corners and building lines.
- 04 Submit the application to the city and await plan review for code and ordinance compliance.
- 05 After plans are properly reviewed, the city issues the permit. The city states issuance is ordinarily within 48 hours unless modifications are required, and commercial structures are ordinarily within one week unless modifications are required.
- 06 Call for required inspections during construction and obtain final inspection and certificate/compliance documentation before occupancy and utility continuity.
Typical processing time: Ordinarily within 48 hours unless modifications are required; commercial structures ordinarily within one week unless modifications are required.
Source: City of Silsbee Permitting ↗
Fee schedule
Silsbee building permit fees
City permits page states all permits must be paid with either cash or check; no credit/debit cards accepted for permits.
Required inspections
Scheduling and sequence
- (409) 385-2863 for inspections (phone)
- Scheduling deadline
- 24 hours notice is required on requested inspections
- Inspection hours
- 10:00 am to 12:00 pm and 3:00 pm to 5:00 pm, Monday through Friday
Typical sequence: Temporary electrical pole hookups; site plan evaluation; foundation and plumbing rough-in before concrete pour; framing with top-out plumbing, rough-in electrical, and rough-in mechanical; energy conservation inspection with third-party documentation; final inspection including plumbing, electrical, mechanical, building, and energy compliance report.
Source: City of Silsbee Permitting ↗
Frequently asked
Common questions about Silsbee permits
01 Do I need a building permit in Silsbee, TX? ▸
02 How much does a building permit cost in Silsbee, TX? ▸
03 How do I apply for a building permit in Silsbee, TX? ▸
04 How long does it take to get a building permit in Silsbee, TX? ▸
05 How do I schedule a building inspection in Silsbee, TX? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Silsbee Permitting before applying. Jaspector is not legal advice.