When a permit is required
Permit triggers and exempt work for Ranger
All mobile homes placed inside Ranger city limits must have the permit filed in advance. Business peddlers, solicitors, and vendors must submit a permit application before conducting services. No clearly documented public general building-permit program for ordinary building work found.
- For mobile homes: title or Statement of Ownership and Location
- Occupant identification
- Legal description and current survey (when not in established park)
- Photographs
- Site plan showing lot details, drainage, driveways, parking, placement, and utility locations
- Building code
- 2019 ordinance adopting the 2018 International Plumbing Code. 2019 flood-loss regulations, 2022 HUD manufactured-home ordinances, and 2025 tiny-home ordinance. No clearly posted current general building-code adoption for IBC or IRC.
- Permit validity
- Mobile home placement application is invalid 90 days from date of receipt at City Hall.
- Owner-builder
- Mobile home application requires contractor-owner-or-authorized-agent signature.
- Contractor requirements
- Electrical, plumbing, and AC-heating connections require state licensed contractors. The city's ordinances page shows a 2019 ordinance adopting the 2018 International Plumbing Code.
Application process
Typical processing: 48 hours for posted solicitor permit; at least 15 business days may be required for mobile home placement review depending on application completeness.
- 01 Confirm the property is inside Ranger city limits.
- 02 Check the city's Permits page to see whether the project falls within one of the permit categories the city currently publishes online. The posted page presently covers mobile home placement permits and peddler-solicitor-vendor permits.
- 03 For mobile homes, complete the Mobile Home Placement Permit Application and attach the required title or Statement of Ownership and Location, identification, and if not in an established park, the legal description, current survey, photographs, and scaled site plan with utilities.
- 04 Submit the application to the City of Ranger for review. The application states all fees must be paid before issuance and that the application is invalid after 90 days from receipt at City Hall.
- 05 The mobile home application states projects may require at least 15 business days depending on completeness and correctness and notes that all permits require a public hearing, with notice to property owners within 500 feet where required by the ordinance.
- 06 For peddlers, solicitors, and vendors, submit the permit application to the city by email at citysecretary@rangertx.gov or in person at 400 W. Main Street. The city states this permit will take 48 hours to be processed.
- 07 The reviewed public record did not reveal a posted start-to-issued general building-permit workflow for ordinary building construction.
Typical processing time: 48 hours for posted solicitor permit; at least 15 business days may be required for mobile home placement review depending on application completeness.
Source: City Hall / Permits ↗
Fee schedule
Ranger building permit fees
All fees due the City of Ranger must be paid in full before issuance of the permit.
Required inspections
Scheduling and sequence
Typical sequence: Mobile home application references plan review and approval but does not publish a separate inspection sequence on the posted form. No public general building-inspection scheduling found.
Source: City Hall / Permits ↗
Frequently asked
Common questions about Ranger permits
01 Do I need a building permit in Ranger, TX? ▸
02 How much does a building permit cost in Ranger, TX? ▸
03 How do I apply for a building permit in Ranger, TX? ▸
04 How long does it take to get a building permit in Ranger, TX? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City Hall / Permits before applying. Jaspector is not legal advice.