How to apply for a building permit in Town of Saint Paul, Texas. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Saint Paul Building Official

Coverage
All properties within the incorporated Town of Saint Paul.
§ 02

When a permit is required

Permit triggers and exempt work for Saint Paul

Building permits required for all construction within Town of Saint Paul.

Required documents
  • Property survey
  • Site plan
  • Building plan
  • Foundation plan
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Contact Town of Saint Paul Building Official or town secretary for permit application procedures.
  2. 02
    Submit building permit application with required plans and documents (property survey, site plan, building plan, foundation plan).
  3. 03
    Town staff reviews application.
  4. 04
    If applicable, septic-system permit must be approved by county official before building permit is issued.
  5. 05
    Pay permit fees.
  6. 06
    Obtain building permit.
§ 04

Fee schedule

Effective August 12, 2019

Fee type
Amount
01
Permit fee formula
Building permit required for all construction

Fees change periodically. Confirm at the official fee schedule ↗ (effective August 12, 2019) before budgeting.

§ 05

Frequently asked

Common questions about Saint Paul permits

01 Do I need a building permit in Saint Paul, TX?
Building permits required for all construction within Town of Saint Paul.
02 How much does a building permit cost in Saint Paul, TX?
Building permit fees in Saint Paul, TX are set by the local building department and vary by project type and valuation. Fees are calculated as: Building permit required for all construction.
03 How do I apply for a building permit in Saint Paul, TX?
To apply for a building permit in Saint Paul, TX, follow these steps: 1. Contact Town of Saint Paul Building Official or town secretary for permit application procedures. 2. Submit building permit application with required plans and documents (property survey, site plan, building plan, foundation plan). 3. Town staff reviews application. 4. If applicable, septic-system permit must be approved by county official before building permit is issued. 5. Pay permit fees. 6. Obtain building permit.
last verified April 2026 entry id permits/texas/collin/saint-paul

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Saint Paul Building Official before applying. Jaspector is not legal advice.