City building permits

Gordonsville

How to apply for a building permit in Gordonsville, Tennessee. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Gordonsville Building Inspector / Town Hall

Street address
63 Main Street East, Gordonsville, TN 38563
Coverage
Applies inside Gordonsville city limits, including the Smith County portion of the town. The town zoning ordinance governs building permits and occupancy permits within the town.
§ 02

When a permit is required

Permit triggers and exempt work for Gordonsville

The zoning ordinance states it is unlawful to begin excavation, construction, moving, adding to a structure, or filling land until the building inspector issues a permit.

No public general exemption list was located in the materials reviewed.
  • Exempt No public general exemption list was located in the materials reviewed.
Required documents
  • Application on forms provided; development plan or plat drawn to scale showing lot shape and dimensions, building locations, intended use, parking, and other essential information
Building code
The town zoning ordinance references local zoning and permit standards; a separate building-code adoption statement was not located on the pages reviewed
Permit validity
Building permits are void six months from the issue date unless substantial progress has been made
Owner-builder
Not publicly stated in the ordinance excerpt located
Contractor requirements
Not publicly stated in the ordinance excerpt located
§ 03

Application process

Typical processing: Not expressly stated for building permits; zoning-related special exceptions are decided within 45 days under a separate form

  1. 01
    Go to the town permits page and open the Building Permit Application.
  2. 02
    Complete the application and provide a site or development plan drawn to scale.
  3. 03
    Submit the application to the building inspector for review.
  4. 04
    The building inspector reviews the plans for compliance with the zoning ordinance.
  5. 05
    If approved, the town issues the building permit.
  6. 06
    A certificate of occupancy is required before the structure is used.

Typical processing time: Not expressly stated for building permits; zoning-related special exceptions are decided within 45 days under a separate form

Source: Town of Gordonsville Building Inspector / Town Hall ↗

§ 04

Fee schedule

Gordonsville building permit fees

Fee type
Amount
01
Minimum permit fee
Not publicly stated for general building permits
02
Plan check fee
Not publicly stated
03
Permit fee formula
Not publicly stated for general building permits
04
Reinspection fee
Not publicly stated

The town's public pages do show a $50 special exception application fee and $100 initial fee plus $50 annual renewal for bed and breakfast homes and short-term rentals, but those are not general building permit fees

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Not publicly stated (phone)
Inspection hours
Town office hours and meeting times are posted, but inspection windows were not found
Time windows
Town office hours and meeting times are posted, but inspection windows were not found

Typical sequence: Zoning review, permit issuance, final occupancy review before use

Not publicly stated

§ 06

Frequently asked

Common questions about Gordonsville permits

01 Do I need a building permit in Gordonsville, TN?
The zoning ordinance states it is unlawful to begin excavation, construction, moving, adding to a structure, or filling land until the building inspector issues a permit.
02 How much does a building permit cost in Gordonsville, TN?
Building permit fees in Gordonsville, TN are set by the local building department and vary by project type and valuation. The minimum permit fee is Not publicly stated for general building permits. Fees are calculated as: Not publicly stated for general building permits. Plan check fee: Not publicly stated.
03 How do I apply for a building permit in Gordonsville, TN?
To apply for a building permit in Gordonsville, TN, follow these steps: 1. Go to the town permits page and open the Building Permit Application. 2. Complete the application and provide a site or development plan drawn to scale. 3. Submit the application to the building inspector for review. 4. The building inspector reviews the plans for compliance with the zoning ordinance. 5. If approved, the town issues the building permit. 6. A certificate of occupancy is required before the structure is used.
04 How long does it take to get a building permit in Gordonsville, TN?
Building permit processing times in Gordonsville, TN typically run Not expressly stated for building permits; zoning-related special exceptions are decided within 45 days under a separate form. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Gordonsville, TN?
Not all construction work requires a permit in Gordonsville, TN. The following work is generally exempt: No public general exemption list was located in the materials reviewed.. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Gordonsville, TN?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Gordonsville, TN via: Not publicly stated.
last verified April 2026 source Town of Gordonsville Building Inspector / Town Hall ↗ entry id permits/tennessee/smith/gordonsville

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Gordonsville Building Inspector / Town Hall before applying. Jaspector is not legal advice.