When a permit is required
Permit triggers and exempt work for Smith County
Smith County's development guide says vacant land can be permitted, a septic permit copy is required, the 911 address is assigned before permit issuance, and new construction and decking on mobile homes require a state building permit. The county application also uses permit categories for residential, commercial, and industrial work.
- Exempt No county-wide exemption list was located in the public materials reviewed
- Exempt Detached non-living structures may still be exempt from the state residential permit program if they are not used for living purposes
- Septic permit or verification, 911 address assignment, site description, contractor name, estimated construction cost, tract size and road frontage, and any existing structures information
- Building code
- State residential program uses the 2018 IRC and 2018 IECC; county application says the state of Tennessee has adopted the International Building Codes
- Permit validity
- Not publicly stated in the county materials reviewed
- Owner-builder
- The county application says self-build is allowable if the owner has not built a home in the last two years
- Contractor requirements
- The county application states a licensed contractor is required under TCA 62-6-103, with responsibility on the owner to verify the contractor is properly licensed
Application process
Typical processing: Not publicly stated
- 01 Confirm whether the project is a county development permit, a state residential building permit, or both.
- 02 For county routed projects, apply through the Smith County Planning Office using its residential building permit application.
- 03 Provide the septic permit or verification, 911 address information, site description, and contractor information.
- 04 For state residential permits, apply in CORE and pay the fee based on construction value.
- 05 Obtain the required permit before new construction, decking on mobile homes, or other regulated work begins.
Typical processing time: Not publicly stated
Source: Smith County Planning Office ↗
Fee schedule
Smith County building permit fees
County application shows payment is collected with the permit application and references septic permit, 911 address, and zoning compliance inspection tracking
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- State residential inspections are scheduled through CORE or email to SFMO.permits-licensing@tn.gov; county inspection steps are not clearly posted (phone)
- Inspection hours
- County Planning Office business hours are Monday through Friday, 8 AM to 4 PM
- Time windows
- County Planning Office business hours are Monday through Friday, 8 AM to 4 PM
Typical sequence: County guide indicates septic, 911 address, zoning compliance, and then permit issuance; state residential inspections follow foundation, rough-in, and final stages
State residential program allows one free reinspection, then charges additional reinspection fees
Frequently asked
Common questions about unincorporated Smith County permits
01 Do I need a building permit in unincorporated Smith County, TN? ▸
02 How much does a building permit cost in unincorporated Smith County, TN? ▸
03 How do I apply for a building permit in unincorporated Smith County, TN? ▸
04 How long does it take to get a building permit in unincorporated Smith County, TN? ▸
05 What work is exempt from building permits in unincorporated Smith County, TN? ▸
06 How do I schedule a building inspection in unincorporated Smith County, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Smith County Planning Office before applying. Jaspector is not legal advice.