On this page 6
When a permit is required
Permit triggers and exempt work for Lakeland
Lakeland's permit page specifically covers accessory structures, fences, signs, tree removal, special events, pools, demolition, and engineering permits. Shelby County permits are additionally required for swimming pools, detached garages, additions, and similar building-code work.
Note: Thin public data: Lakeland does not publish a consolidated local exemption list on the permit page. Verify directly with Lakeland and, where applicable, Shelby County before assuming work is exempt.
- Permit-specific applications
- Plans
- Supporting documents for accessory structures, fences, pools, signs, temporary signs, tree removal, and demolition
- Shelby County plan and submittal requirements where applicable
- Building code
- Lakeland directs applicants to Develop901 to determine the adopted code that relates to the project; Shelby County Construction Enforcement publicly states it enforces the 2021 I-Codes and 2020 NEC.
- Permit validity
- Lakeland's permit page does not publish a citywide expiration rule. Shelby County permit expiration rules still apply for the construction permit.
- Owner-builder
- No dedicated Lakeland owner-builder page was found; confirm directly with Lakeland and Shelby County for homeowner self-permit rules.
- Contractor requirements
- Public-facing Lakeland page does not spell out a separate city contractor-license rule for all permit types; Shelby County and Tennessee state licensing rules apply where Shelby County issues the permit.
Application process
Typical processing: No public general processing-time estimate found.
- 01 Determine whether the project is a city-only permit item or also requires a Shelby County building permit.
- 02 For city permits, create a Cityworks account and submit online, or use the paper permit forms listed on the Lakeland permit page and return them to City Hall in person.
- 03 For pools, detached garages, additions, and similar structural work, also apply through Shelby County Construction Enforcement after confirming the adopted code and local Lakeland permit requirements.
- 04 Submit any engineering permit if the work involves land disturbance or retaining walls.
- 05 Pay city permit fees from Lakeland's fee schedule and any separate Shelby County construction fees.
- 06 Obtain inspections and final approvals from the relevant city department and Shelby County as applicable.
Typical processing time: No public general processing-time estimate found.
Fee schedule
Lakeland building permit fees
Paper permit applications must be returned to City Hall in person; the page states paper applications will not be accepted by email or other electronic delivery unless otherwise approved through the Planning Department.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- City department for city permits and Shelby County procedures for county building permits (other)
Typical sequence: Depends on whether the permit is city-only, engineering-related, or a Shelby County building permit; city review occurs first for local overlays and county inspections follow county permit issuance.
Frequently asked
Common questions about Lakeland permits
01 Do I need a building permit in Lakeland, TN? ▸
02 How much does a building permit cost in Lakeland, TN? ▸
03 How do I apply for a building permit in Lakeland, TN? ▸
04 How long does it take to get a building permit in Lakeland, TN? ▸
05 How do I schedule a building inspection in Lakeland, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Lakeland Planning Department for city permits, with Memphis and Shelby County Office of Construction Code Enforcement for Shelby County building permits on covered projects before applying. Jaspector is not legal advice.