When a permit is required
Permit triggers and exempt work for Collierville
Collierville requires permits for construction, enlargement, alteration, repair, movement, demolition, occupancy changes, and regulated electrical, gas, mechanical, and plumbing work. Fences and signs have their own permit processes.
- Exempt Normal maintenance and repairs of existing buildings and structures and associated systems
- Exempt Painting, papering, tiling, carpeting, cabinets, counters, and similar finish work
- Exempt Concrete patios
- Exempt Siding unless in a historic district
- Exempt Windows when sash only is replaced
- Project-specific forms
- Plans
- Valuation
- Contractor information
- Site plans or lot plots
- Homeowner affidavits
- ResCheck
- Surveys
- Permit-specific checklists
- Building code
- Town page states Collierville enforces the 2018 International Codes and 2017 National Electrical Code with local amendments.
- Permit validity
- Approved permit applications are generally valid for 180 days from the application date; issued permits are generally valid if work starts within 180 days and is not suspended or abandoned for more than 180 days.
- Owner-builder
- Collierville's residential page states the state allows a homeowner to pull a new single-family dwelling permit once every two years using the published homeowner affidavit.
- Contractor requirements
- Commercial repairs and alterations must use a Tennessee licensed contractor. Trade work must be performed by a licensed contractor of that trade.
Application process
Typical processing: No general issuance SLA posted.
- 01 Determine project type using the Residential Projects, Commercial Projects, and FAQ pages.
- 02 For new commercial buildings, contact Development at (901) 457-2300 to schedule a pre-application meeting.
- 03 Submit the town building permit application, plans, and required supporting documents to Building and Codes; contractors may apply for most permits through the iWorQ portal, and in-person applications are accepted at Town Hall.
- 04 Pay the plan review fee at submittal.
- 05 Address review comments; when approved, the town may schedule a pre-construction meeting for commercial projects.
- 06 Receive the building permit, then pull trade permits as needed.
- 07 Complete required inspections and obtain CO when all applicable divisions approve the work.
Typical processing time: No general issuance SLA posted.
Fee schedule
Collierville building permit fees
Accepted methods include cash, check payable to the Town of Collierville, and credit card with a 3.25 percent convenience fee.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Building and Codes: (901) 457-2310 (phone)
- building_codes@colliervilletn.gov (email)
- Contractor portal (online)
- Inspection hours
- Monday-Friday, 7:00 AM to 4:00 PM
Typical sequence: Permit forms list site, footing, posthole, slab, floor joist, sheathing, strapping, brick tie, rough-in plumbing, rough-in electrical, mechanical, and final approvals as applicable.
Frequently asked
Common questions about Collierville permits
01 Do I need a building permit in Collierville, TN? ▸
02 How much does a building permit cost in Collierville, TN? ▸
03 How do I apply for a building permit in Collierville, TN? ▸
04 How long does it take to get a building permit in Collierville, TN? ▸
05 What work is exempt from building permits in Collierville, TN? ▸
06 How do I schedule a building inspection in Collierville, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Collierville Building and Codes Division before applying. Jaspector is not legal advice.