On this page 6
When a permit is required
Permit triggers and exempt work for Smyrna
Building Safety handles permits, plan review, and inspections for new construction, remodels, trade permits, pools, mobile homes, signs, demolition, and related work shown on the permit page.
Note: A full exempt-work list was not clearly presented on the reviewed public pages. The town distinguishes permit-triggering work through permit application categories and building safety guidance rather than a single extracted exemption list on the pages reviewed.
- Permit application
- Plan review application when applicable
- Electronic plans
- Two paper plan sets for building plan review
- Site plan for applicable residential projects
- Subcontractor sheet and trade-specific load/data sheets as required by the form set
- Building code
- Effective February 1, 2019 the town lists 2018 IBC, IRC, IPC, IMC, IFGC, IPMC, IFC, IECC, ISPSC, IEBC, and 2017 NEC. A 2024 code update notice is posted with proposed April 20, 2026 implementation.
- Permit validity
- Public-facing permit pages reviewed did not clearly state a general permit expiration rule. The fee schedule includes a building permit extension or renewal line item.
- Owner-builder
- A Homeowner Building Permit form is publicly posted, indicating owner-builder processing is available through a dedicated form path.
- Contractor requirements
- Smyrna publishes three required items for permit issuance: Tennessee contractor license or Home Improvement/LLE/LLP credential, workers compensation certificate or exemption in the same name, and Town of Smyrna business tax license or release form.
Application process
Typical processing: Not published as a universal turnaround on the reviewed pages; plan-review timing is not summarized with a standard SLA on the public page.
- 01 Identify the needed permit from the Building Safety permit page and download the correct application/form set.
- 02 For standard permit applications, complete the form and submit through Cityworks Public Access or by the method listed for the permit type.
- 03 For building plan review, submit through the Cityworks portal or use the in-person/email plan review route with the plan review request form.
- 04 If using the plan review process, provide an electronic plan set plus two paper plan sets; the town asks for 24 x 36 sheets when possible.
- 05 Provide contractor licensing, insurance, and business tax information required for issuance.
- 06 After review and approval, pay fees, receive the permit, and schedule inspections online.
Typical processing time: Not published as a universal turnaround on the reviewed pages; plan-review timing is not summarized with a standard SLA on the public page.
Fee schedule
Smyrna building permit fees
Fees are tied to permit issuance after review. Confirm portal payment options at filing because the public pages emphasize application intake rather than payment instructions.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Building Safety inspection pages and request forms (online)
- Scheduling deadline
- Pool inspection requests should be made by 3:30 p.m. the prior day to qualify for next-business-day inspection.
Typical sequence: Smyrna publicly references footing, slab, framing, house wrap, plumbing, gas, rough-in, service release, temporary pole, grounding, and final inspections depending on scope.
Frequently asked
Common questions about Smyrna permits
01 Do I need a building permit in Smyrna, TN? ▸
02 How much does a building permit cost in Smyrna, TN? ▸
03 How do I apply for a building permit in Smyrna, TN? ▸
04 How long does it take to get a building permit in Smyrna, TN? ▸
05 How do I schedule a building inspection in Smyrna, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Smyrna Department of Building Safety before applying. Jaspector is not legal advice.