On this page 6
When a permit is required
Permit triggers and exempt work for Murfreesboro
Building permits are required as prescribed by the IRC/IBC for construction, alteration, repairs other than ordinary maintenance, fences, accessory buildings, pools, and applicable trade work.
- Exempt Ordinary maintenance repairs to existing buildings and structures
Note: The city publishes specific FAQ and permit-information pages for exempt vs. non-exempt work, but the complete exempt-work text was not fully extractable from the reviewed public pages.
- Application form
- Plans for the specific permit type
- Site plan where required
- Trade applications
- Energy/testing forms for applicable residential work
- Commercial electronic plan sets
- Building code
- 2018 IBC, IRC, IPC, IMC, IFGC, IPMC, IFC, IECC, ISPSC, IEBC, and 2017 NEC, with a posted 2026 code update notice.
- Permit validity
- Temporary certificates of occupancy require a TCO agreement and deposit; the public fee ordinance also references permit-related deposits and additional CO fees, but a general permit expiration rule was not clearly stated on the reviewed public-facing pages.
- Owner-builder
- Homeowner permit and homeowner building permit forms are publicly posted; owner-builder handling appears form-based and should be verified against the current application packet before filing.
- Contractor requirements
- Permit pages route applicants to contractor-facing forms and trade applications; specific state/local license requirements depend on scope and trade. Confirm at filing for each permit type.
Application process
Typical processing: Not published as a universal number on the main permit pages reviewed.
- 01 Confirm permit type from the Permit Center and download the correct application packet or use the online portal.
- 02 Assemble supporting documents listed for the permit type, including plans, site details, and trade information as applicable.
- 03 Submit residential material by email or in person as directed on the residential permit page, or submit commercial projects through the Cityworks portal/electronic plans process.
- 04 Staff reviews zoning, code, and plan items; corrections or additional documents may be requested before approval.
- 05 Pay permit fees and any related deposits or impact fees before permit issuance.
- 06 Receive the issued permit and approved documents, then call/request required inspections through the city process.
Typical processing time: Not published as a universal number on the main permit pages reviewed.
Source: City of Murfreesboro Planning Department, Building Codes Division ↗
Fee schedule
Murfreesboro building permit fees
Impact fees may apply at issuance for some projects; fees and deposits are due before issuance/final approvals.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- City inspection request pages/portals (city_portal)
- Inspection hours
- Building code questions are handled by inspectors in the office from about 8:00 a.m. to 8:45 a.m. and again near 4:00 p.m.
Typical sequence: Typical sequences include footing/foundation, slab, framing, rough trade inspections, insulation/energy items as applicable, and final inspection.
Frequently asked
Common questions about Murfreesboro permits
01 Do I need a building permit in Murfreesboro, TN? ▸
02 How much does a building permit cost in Murfreesboro, TN? ▸
03 How do I apply for a building permit in Murfreesboro, TN? ▸
04 How long does it take to get a building permit in Murfreesboro, TN? ▸
05 What work is exempt from building permits in Murfreesboro, TN? ▸
06 How do I schedule a building inspection in Murfreesboro, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Murfreesboro Planning Department, Building Codes Division before applying. Jaspector is not legal advice.