On this page 6
When a permit is required
Permit triggers and exempt work for Spring Hill (Maury portion)
City publishes permit applications for residential buildings, commercial buildings, decks, fences, retaining walls, sheds, swimming pools, patio covers, pergolas, screen porches, sewer or water taps, signs, and flood zone work. Permits required unless adopted code exemption applies.
- Exempt Portable one-story detached accessory structures used as tool/storage sheds, playhouses, and similar uses where floor area does not exceed 32 square feet
- Exempt Fences not over 32 inches high
- Exempt Replacement of HVAC unit where heating/cooling capacity and fuel source are not changed
- Exempt Decks not exceeding 9 square feet in area and not more than 30 inches above grade at any point
- Exempt Roof covering replacement that does not involve replacement of roof deck or framing
- Permit application
- Plot plan
- Drawing or plans of the structure
- Digital commercial plans including MEP sets for commercial submissions
- Contractor license and insurance for jobs $25,000 and above
- Building code
- 2018 International Residential Code per Building Codes page. Ordinance 20-16 adopts 2018 editions of IBC, IRC, IPC, IFGC, IMC, IECC, IFC, and International Swimming Pool and Spa Code.
- Permit validity
- Permit expires 6 months from date paid.
- Owner-builder
- No dedicated Spring Hill owner-builder affidavit found on public pages.
- Contractor requirements
- Contractor license and insurance required for jobs $25,000 and above.
Source: City of Spring Hill Development Services, Building Codes and Inspection Department ↗
Application process
Typical processing: Not posted on the Building Codes or Applications and Permits pages.
- 01 Download the correct permit application and checklist from the Applications and Permits page (residential, deck, fence, pool, commercial).
- 02 Assemble the application package. Residential forms require a plot plan and drawing of the structure; commercial submittals require completed application plus digital plan set including MEP documents.
- 03 Email the completed permit application package to permits@springhilltn.org, or deliver materials to Development Services address. Commercial plans can be emailed, sent by link, or provided on a USB drive.
- 04 Staff reviews the submittal for code, zoning, floodplain, and development compliance. Additional information or revised documents may be requested before permit issuance.
- 05 Pay building permit fees, impact fees if applicable, and related department fees.
- 06 After permit issuance, request required inspections by email to the Codes office.
- 07 Complete final approvals before occupancy or use.
Typical processing time: Not posted on the Building Codes or Applications and Permits pages.
Fee schedule
Effective January 1, 2024 (currently $0.46 per square foot under roof)
Current public fee table is in citywide resolution rather than separate building-only schedule. Verify current CPI-adjusted square-foot rate with Codes office; city posts annual fee increase notices.
Fees change periodically. Confirm at the official fee schedule ↗ (effective January 1, 2024 (currently $0.46 per square foot under roof)) before budgeting.
Required inspections
Scheduling and sequence
- permits@springhilltn.org (email)
- Time windows
- No public inspection window or cutoff time posted
Typical sequence: Public pages do not provide single consolidated sequence. Applicants should confirm required footing, framing, rough trade, energy, and final inspections for specific permit type.
Source: City of Spring Hill Development Services, Building Codes and Inspection Department ↗
Frequently asked
Common questions about Spring Hill (Maury portion) permits
01 Do I need a building permit in Spring Hill (Maury portion), TN? ▸
02 How much does a building permit cost in Spring Hill (Maury portion), TN? ▸
03 How do I apply for a building permit in Spring Hill (Maury portion), TN? ▸
04 How long does it take to get a building permit in Spring Hill (Maury portion), TN? ▸
05 What work is exempt from building permits in Spring Hill (Maury portion), TN? ▸
06 How do I schedule a building inspection in Spring Hill (Maury portion), TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Spring Hill Development Services, Building Codes and Inspection Department before applying. Jaspector is not legal advice.