On this page 6
When a permit is required
Permit triggers and exempt work for Mount Pleasant
Mount Pleasant publishes permit applications for building construction and remodeling, demolition, fences, signs, swimming pools, curb cuts and driveways, land disturbance, plumbing, mechanical, zoning, and floodplain development. Permits required unless specific exemption applies.
Note: Thin public data; no complete public Mount Pleasant exemption list found on reviewed pages or fee schedule. Verify with Building and Planning before relying on standard code exemptions, as the city publishes permit forms for many work categories.
- Completed permit application
- Plot plan
- Project description
- Plans or drawings for the work
- Contractor license if valuation exceeds $25,000
- Certificate of workers compensation insurance naming the city
- Separate zoning, floodplain, or utility-related forms triggered by project
- Building code
- City of Mount Pleasant adopted 2024 International Building Codes with amendments in City Resolution 2025-1136, enforced by city Building Inspections office.
- Permit validity
- Permit becomes null and void if work is not commenced within 6 months, or if work is suspended or abandoned for 6 months after commencement.
- Owner-builder
- No stand-alone Mount Pleasant owner-builder affidavit found on reviewed pages.
- Contractor requirements
- Current State of Tennessee contractor license required if project valuation exceeds $25,000, plus workers compensation insurance listing the city as certificate holder.
Application process
Typical processing: Not posted on reviewed Mount Pleasant pages or forms.
- 01 Download the needed application from the Construction page (general building permit, demolition, fence, sign, plumbing, mechanical, zoning, floodplain, land disturbance).
- 02 Prepare the application with project address, valuation, square footage, plot plan, and plans or supporting details required for proposed work.
- 03 Submit the completed permit package by email to permits@mtpleasant-tn.gov, or work directly with Building and Planning Department at City Hall.
- 04 Provide contractor licensing and workers compensation insurance documents when required. State of Tennessee contractor license required for projects over $25,000 with City of Mt. Pleasant as certificate holder.
- 05 Respond to any zoning or code review comments, then pay permit fees through the city payment link or approved payment method.
- 06 After permit issuance, complete inspections and any temporary certificate of occupancy process if needed before final occupancy.
Typical processing time: Not posted on reviewed Mount Pleasant pages or forms.
Fee schedule
Mount Pleasant building permit fees
Payment link routes to Citisen guest payment portal. Credit cards carry $2 minimum or 2.50% of subtotal; ACH over $10,000 carries additional 0.20% charge on amounts above $10,000.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 931-379-7717 (phone)
- Time windows
- Not publicly posted
Typical sequence: Not published in consolidated city inspection checklist on reviewed pages.
Source: City of Mount Pleasant Building and Planning Department ↗
Frequently asked
Common questions about Mount Pleasant permits
01 Do I need a building permit in Mount Pleasant, TN? ▸
02 How much does a building permit cost in Mount Pleasant, TN? ▸
03 How do I apply for a building permit in Mount Pleasant, TN? ▸
04 How long does it take to get a building permit in Mount Pleasant, TN? ▸
05 How do I schedule a building inspection in Mount Pleasant, TN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Mount Pleasant Building and Planning Department before applying. Jaspector is not legal advice.