On this page 6
When a permit is required
Permit triggers and exempt work for Surfside Beach
Public forms show permits for new buildings or structures, additions, renovation and remodel, repair and replacement, move and demolition work, electrical, mechanical and gas, plumbing, pools, signs, encroachments, zoning approvals, tree removal, and other listed activities.
Note: No simple public Surfside Beach exemption checklist was identified on the reviewed permit pages. Confirm claimed exemptions directly with PB&Z before relying on them.
- Project-specific permit application
- Tax map number
- Zoning district and flood zone information
- Detailed scope of work
- Contractor state license and town business license
- Construction value
- Any required flood hazard addendum, site materials, or zoning approvals
- Building code
- Town ordinance adopts the latest editions as adopted by the South Carolina Building Codes Council, including building, residential, fire, plumbing, mechanical, energy, fuel gas, NEC, International Property Maintenance Code, and International Swimming Pool and Spa Code.
- Permit validity
- Building permit application states all permits are non-transferable and non-refundable. No public permit-expiration interval was clearly identified on the reviewed current pages.
- Owner-builder
- No separate current Surfside Beach owner-builder handout was identified on the reviewed pages.
- Contractor requirements
- Building permit application requires contractor state license number and town business license number.
Application process
Typical processing: No public townwide review clock was identified on the reviewed pages.
- 01 Start on the Planning, Building & Zoning page and pull the applicable permit form from the Building & Zoning Forms page.
- 02 Complete the form for the project type, such as building permit, new construction, addition, pool packet, zoning approval, sign permit, or tree removal.
- 03 Submit the application to the Planning, Building & Zoning Department / Permit Technician for review.
- 04 The Building Official, zoning staff, floodplain review, and other town reviewers process the application as needed.
- 05 Pay the applicable permit, zoning, and plan review fees under the adopted town fee schedule.
- 06 Obtain the permit, keep approved materials on site, and proceed through required inspections and any appeal process if needed.
Typical processing time: No public townwide review clock was identified on the reviewed pages.
Source: Planning, Building & Zoning Department, Town of Surfside Beach ↗
Fee schedule
Surfside Beach building permit fees
Town fee schedule is consolidated in the FY25-26 comprehensive fee schedule. No separate public online permit-payment portal was identified.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 843-913-6341 (phone)
Typical sequence: Permit issuance, project-specific building and zoning inspections, and final signoff by the applicable town officials.
Source: Planning, Building & Zoning Department, Town of Surfside Beach ↗
Frequently asked
Common questions about Surfside Beach permits
01 Do I need a building permit in Surfside Beach, SC? ▸
02 How much does a building permit cost in Surfside Beach, SC? ▸
03 How do I apply for a building permit in Surfside Beach, SC? ▸
04 How long does it take to get a building permit in Surfside Beach, SC? ▸
05 How do I schedule a building inspection in Surfside Beach, SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning, Building & Zoning Department, Town of Surfside Beach before applying. Jaspector is not legal advice.