On this page 5
When a permit is required
Permit triggers and exempt work for Laceyville Borough
Pennsylvania UCC permit triggers apply to new construction, additions, structural alterations, demolition, change of occupancy, many decks and pools, and regulated building, electrical, plumbing, mechanical, and energy work.
Note: No municipality-specific exempt-work handout was located. Confirm any exemption claims directly with the code official before proceeding.
- Permit application
- Parcel information
- Construction plans
- Contractor information
- Any triggered zoning, sewage, floodplain, driveway, or planning approvals
- Building code
- Pennsylvania Uniform Construction Code (UCC), opt-in municipality. Statewide triennial update effective January 1, 2026. Pennsylvania L&I lists no amendments for this municipality.
- Owner-builder
- Owners may often apply directly or through an authorized agent, but the permit holder remains responsible for code compliance and inspections.
- Contractor requirements
- Pennsylvania home improvement contractors performing covered work over $5,000 should confirm HICPA registration requirements. No separate municipal contractor-license requirement was identified.
Source: Laceyville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the parcel jurisdiction and ask the municipality whether zoning, floodplain, sewage, driveway, or land-development approvals are required before UCC permit issuance.
- 02 If local zoning applies, secure the required zoning or pre-construction signoff from the municipality before or alongside the UCC filing.
- 03 Submit the building permit application, plans, and supporting documents to the listed code official or contracted agency.
- 04 Pay the quoted fee and wait for permit issuance before beginning regulated work.
- 05 Schedule inspections and obtain final approval before occupancy or project closeout.
Source: Laceyville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗
Required inspections
Scheduling and sequence
- (570) 836-7196 — Listed code official (phone)
Typical sequence: Pennsylvania UCC inspection sequence typically includes footing, foundation, under-slab, rough-in, framing, insulation, and final inspections as applicable. Advance scheduling is required before each stage.
Source: Laceyville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗
Frequently asked
Common questions about Laceyville Borough permits
01 Do I need a building permit in Laceyville Borough, PA? ▸
02 How do I apply for a building permit in Laceyville Borough, PA? ▸
03 How do I schedule a building inspection in Laceyville Borough, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Laceyville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge before applying. Jaspector is not legal advice.