§ 01

Permit authority

Factoryville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge

Coverage
All properties within Factoryville Borough. This municipality is zoned and has its own subdivision and land-development approval authority.
§ 02

When a permit is required

Permit triggers and exempt work for Factoryville Borough

Pennsylvania UCC permit triggers apply to new construction, additions, structural alterations, demolition, change of occupancy, many decks and pools, and regulated building, electrical, plumbing, mechanical, and energy work.

Note: No municipality-specific exempt-work handout was located. Confirm any exemption claims directly with the code official before proceeding.

Required documents
  • Permit application
  • Parcel information
  • Construction plans
  • Contractor information
  • Any triggered zoning, sewage, floodplain, driveway, or planning approvals
Building code
Pennsylvania Uniform Construction Code (UCC), opt-in municipality. Statewide triennial update effective January 1, 2026. Pennsylvania L&I lists no amendments for this municipality.
Owner-builder
Owners may often apply directly or through an authorized agent, but the permit holder remains responsible for code compliance and inspections.
Contractor requirements
Pennsylvania home improvement contractors performing covered work over $5,000 should confirm HICPA registration requirements. No separate municipal contractor-license requirement was identified.

Source: Factoryville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm the parcel jurisdiction and ask the municipality whether zoning, floodplain, sewage, driveway, or land-development approvals are required before UCC permit issuance.
  2. 02
    If local zoning applies, secure the required zoning or pre-construction signoff from the municipality before or alongside the UCC filing.
  3. 03
    Submit the building permit application, plans, and supporting documents to the listed code official or contracted agency.
  4. 04
    Pay the quoted fee and wait for permit issuance before beginning regulated work.
  5. 05
    Schedule inspections and obtain final approval before occupancy or project closeout.

Source: Factoryville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (570) 836-7196 — Listed code official (phone)

Typical sequence: Pennsylvania UCC inspection sequence typically includes footing, foundation, under-slab, rough-in, framing, insulation, and final inspections as applicable. Advance scheduling is required before each stage.

Source: Factoryville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗

§ 05

Frequently asked

Common questions about Factoryville Borough permits

01 Do I need a building permit in Factoryville Borough, PA?
Pennsylvania UCC permit triggers apply to new construction, additions, structural alterations, demolition, change of occupancy, many decks and pools, and regulated building, electrical, plumbing, mechanical, and energy work.
02 How do I apply for a building permit in Factoryville Borough, PA?
To apply for a building permit in Factoryville Borough, PA, follow these steps: 1. Confirm the parcel jurisdiction and ask the municipality whether zoning, floodplain, sewage, driveway, or land-development approvals are required before UCC permit issuance. 2. If local zoning applies, secure the required zoning or pre-construction signoff from the municipality before or alongside the UCC filing. 3. Submit the building permit application, plans, and supporting documents to the listed code official or contracted agency. 4. Pay the quoted fee and wait for permit issuance before beginning regulated work. 5. Schedule inspections and obtain final approval before occupancy or project closeout.
03 How do I schedule a building inspection in Factoryville Borough, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Factoryville Borough, PA via: (570) 836-7196 — Listed code official.
last verified April 2026 source Factoryville Borough — Pennsylvania L&I-listed building code official Edward (Ty) Dodge ↗ entry id permits/pennsylvania/wyoming/factoryville-borough