How to apply for a building permit in Todd Township, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Todd Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections

Street address
Todd Township Municipal Building, 2998 East Dutch Corner Road, McConnellsburg, PA 17233; PMCA McConnellsburg Office, 105 Lincoln Way East, McConnellsburg, PA 17233
Coverage
Todd Township posts a local land use permit form and ordinance links. PMCA provides the UCC permit application and inspection platform.
Online portal
PMCA CommunityCore Portal
CommunityCore
§ 02

When a permit is required

Permit triggers and exempt work for Todd Township

Local land use review plus PMCA UCC permitting applies to regulated building work. No more detailed township-specific online trigger matrix was found.

Residential re-roofing without structural work does not require a PMCA building permit under PMCA's published re-roof guidance
  • Exempt Residential re-roofing without structural work does not require a PMCA building permit under PMCA's published re-roof guidance

Note: Exempt from building permit does not mean exempt from local land use or floodplain requirements. Confirm with Todd Township and PMCA before proceeding.

Required documents
  • Todd Township land use permit
  • PMCA building permit package
  • Plans or plot plan
  • Contractor information
  • Workers compensation information or exemption
  • Any required prior approvals
Building code
Pennsylvania Uniform Construction Code (UCC), enforced locally
Permit validity
UCC 180-day commencement and inactivity limits apply. Maximum permit term of 5 years per PMCA extension materials.
Owner-builder
Owner or authorized agent may apply.
Contractor requirements
PMCA forms request Pennsylvania Home Improvement Contractor registration where applicable.

Source: Todd Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections ↗

§ 03

Application process

Typical processing: No Todd Township-specific timeline posted. PMCA says inspection requests submitted before 3:00 PM are generally scheduled for the next business day.

  1. 01
    Complete Todd Township's local land use permit and confirm local sewage, floodplain, driveway, and planning requirements.
  2. 02
    Assemble the PMCA UCC permit application and supporting plans.
  3. 03
    Submit the permit through PMCA online or by paper, selecting Todd Township.
  4. 04
    After permit issuance, schedule inspections through PMCA with the permit number.

Typical processing time: No Todd Township-specific timeline posted. PMCA says inspection requests submitted before 3:00 PM are generally scheduled for the next business day.

Source: Todd Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Requests submitted before 3:00 PM are generally scheduled for the next business day.
Inspection hours
PMCA McConnellsburg office: Tuesdays 9:00 AM to 3:00 PM and by appointment

Typical sequence: Project-dependent UCC inspection sequence after permit issuance.

Source: Todd Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections ↗

§ 05

Frequently asked

Common questions about Todd Township permits

01 Do I need a building permit in Todd Township, PA?
Local land use review plus PMCA UCC permitting applies to regulated building work. No more detailed township-specific online trigger matrix was found.
02 How do I apply for a building permit in Todd Township, PA?
To apply for a building permit in Todd Township, PA, follow these steps: 1. Complete Todd Township's local land use permit and confirm local sewage, floodplain, driveway, and planning requirements. 2. Assemble the PMCA UCC permit application and supporting plans. 3. Submit the permit through PMCA online or by paper, selecting Todd Township. 4. After permit issuance, schedule inspections through PMCA with the permit number.
03 How long does it take to get a building permit in Todd Township, PA?
Building permit processing times in Todd Township, PA typically run No Todd Township-specific timeline posted. PMCA says inspection requests submitted before 3:00 PM are generally scheduled for the next business day.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Todd Township, PA?
Not all construction work requires a permit in Todd Township, PA. The following work is generally exempt: Residential re-roofing without structural work does not require a PMCA building permit under PMCA's published re-roof guidance. Note: Exempt from building permit does not mean exempt from local land use or floodplain requirements. Confirm with Todd Township and PMCA before proceeding. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Todd Township, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Todd Township, PA via: PMCA online inspection request form, PMCA McConnellsburg: (717) 325-4324. Requests submitted before 3:00 PM are generally scheduled for the next business day..

Educational reference. Permit rules and fees change — confirm current requirements directly with Todd Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections before applying. Jaspector is not legal advice.