How to apply for a building permit in Taylor Township, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Taylor Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections

Street address
Taylor Township Municipal Building, 4421 Waterfall Road, Harrisonville, PA 17228; PMCA McConnellsburg Office, 105 Lincoln Way East, McConnellsburg, PA 17233
Coverage
Taylor Township posts municipal contacts and ordinance documents but limited permit detail. PMCA provides the UCC permit portal and inspection system.
Online portal
PMCA CommunityCore Portal
CommunityCore
§ 02

When a permit is required

Permit triggers and exempt work for Taylor Township

UCC-regulated work requires a permit. Taylor Township did not publish a more detailed local trigger list online.

Residential re-roofing without structural work does not require a PMCA building permit under PMCA's published re-roof guidance
  • Exempt Residential re-roofing without structural work does not require a PMCA building permit under PMCA's published re-roof guidance

Note: Exempt from building permit does not mean exempt from local land use or floodplain requirements. Confirm with Taylor Township and PMCA before proceeding.

Required documents
  • PMCA permit packet
  • Project description
  • Plot plan
  • Contractor information
  • Workers compensation information or exemption
  • Any required prior approvals
Building code
Pennsylvania Uniform Construction Code (UCC), enforced locally
Permit validity
UCC 180-day commencement and inactivity limits apply. Maximum permit life of 5 years per PMCA extension materials.
Owner-builder
Owner or authorized agent may apply.
Contractor requirements
PMCA forms request Pennsylvania Home Improvement Contractor registration where applicable.

Source: Taylor Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections ↗

§ 03

Application process

Typical processing: No Taylor Township-specific review estimate posted. PMCA says inspections requested before 3:00 PM are generally scheduled for the next business day.

  1. 01
    Contact Taylor Township first to confirm local floodplain, sewage, stormwater, driveway, or planning prerequisites.
  2. 02
    Complete the PMCA permit application package and assemble plans, plot plan, and contractor information.
  3. 03
    Submit through PMCA online or by paper, selecting Taylor Township.
  4. 04
    After permit issuance, request inspections through PMCA using the permit number.

Typical processing time: No Taylor Township-specific review estimate posted. PMCA says inspections requested before 3:00 PM are generally scheduled for the next business day.

Source: Taylor Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Requests submitted before 3:00 PM are generally scheduled for the next business day.
Inspection hours
PMCA McConnellsburg office: Tuesdays 9:00 AM to 3:00 PM and by appointment

Typical sequence: Project-dependent UCC inspection sequence after permit issuance.

Source: Taylor Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections ↗

§ 05

Frequently asked

Common questions about Taylor Township permits

01 Do I need a building permit in Taylor Township, PA?
UCC-regulated work requires a permit. Taylor Township did not publish a more detailed local trigger list online.
02 How do I apply for a building permit in Taylor Township, PA?
To apply for a building permit in Taylor Township, PA, follow these steps: 1. Contact Taylor Township first to confirm local floodplain, sewage, stormwater, driveway, or planning prerequisites. 2. Complete the PMCA permit application package and assemble plans, plot plan, and contractor information. 3. Submit through PMCA online or by paper, selecting Taylor Township. 4. After permit issuance, request inspections through PMCA using the permit number.
03 How long does it take to get a building permit in Taylor Township, PA?
Building permit processing times in Taylor Township, PA typically run No Taylor Township-specific review estimate posted. PMCA says inspections requested before 3:00 PM are generally scheduled for the next business day.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Taylor Township, PA?
Not all construction work requires a permit in Taylor Township, PA. The following work is generally exempt: Residential re-roofing without structural work does not require a PMCA building permit under PMCA's published re-roof guidance. Note: Exempt from building permit does not mean exempt from local land use or floodplain requirements. Confirm with Taylor Township and PMCA before proceeding. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Taylor Township, PA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Taylor Township, PA via: PMCA online inspection request form, PMCA McConnellsburg: (717) 325-4324. Requests submitted before 3:00 PM are generally scheduled for the next business day..

Educational reference. Permit rules and fees change — confirm current requirements directly with Taylor Township Municipal Office; Pennsylvania Municipal Code Alliance, Inc. (PMCA) for UCC building permits and inspections before applying. Jaspector is not legal advice.