On this page 6
When a permit is required
Permit triggers and exempt work for Shippensburg
Borough FAQ states building permits are required for work covered by the Pennsylvania UCC. Issuance of a Land Use Permit is a prerequisite to obtaining a building permit. Sidewalk repair or construction and street opening work also require permits.
Note: No consolidated borough exempt-work list was found on the public Shippensburg pages reviewed. Borough FAQ instead states any work covered by the PA UCC needs a building permit, with land use approval first where applicable. Confirm any exemption directly with borough zoning staff and PMCA before proceeding.
- Land use permit materials for zoning review
- PMCA building permit application packet and supporting UCC documents depending on scope
- Building code
- Pennsylvania UCC; Shippensburg Borough has opted in to the Pennsylvania Uniform Construction Code
- Permit validity
- Not clearly posted on the borough public pages.
- Owner-builder
- Not clearly posted on borough pages.
- Contractor requirements
- Pennsylvania HICPA registration applies to covered home improvement contractors; PMCA building permit process follows the PA UCC for served municipalities.
Source: Borough of Shippensburg Codes/Zoning, designated inspection agency PMCA ↗
Application process
Typical processing: Not posted on the borough Codes/Zoning page.
- 01 Determine whether a Land Use Permit is required; it is required in conjunction with any required building permit and for any new use or change of use before construction or alteration.
- 02 Submit the land use or local borough application to the Borough of Shippensburg.
- 03 For UCC building permit work, coordinate with the borough's designated inspection agency (PMCA).
- 04 Use PMCA's online permit platform or its permit application forms to submit the UCC permit package.
- 05 Pay borough land use fees and PMCA building permit fees under the designated agency's schedule.
- 06 Obtain all approvals before starting work and complete inspections through the designated agency or borough representative, depending on permit type.
Typical processing time: Not posted on the borough Codes/Zoning page.
Source: Borough of Shippensburg Codes/Zoning, designated inspection agency PMCA ↗
Fee schedule
Shippensburg building permit fees
Public fee data is split between borough local fees and PMCA agency charges, so applicants need both schedules
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- PMCA online inspection tools for PMCA-issued permits (online)
- Borough representative for local permits (sidewalks, street openings) (phone)
- Inspection hours
- Not clearly posted on the borough pages
Typical sequence: Land use permit first where applicable, UCC permit issuance through designated agency, progress inspections, final approval
Source: Borough of Shippensburg Codes/Zoning, designated inspection agency PMCA ↗
Frequently asked
Common questions about Shippensburg permits
01 Do I need a building permit in Shippensburg, PA? ▸
02 How much does a building permit cost in Shippensburg, PA? ▸
03 How do I apply for a building permit in Shippensburg, PA? ▸
04 How long does it take to get a building permit in Shippensburg, PA? ▸
05 How do I schedule a building inspection in Shippensburg, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Borough of Shippensburg Codes/Zoning, designated inspection agency PMCA before applying. Jaspector is not legal advice.