When a permit is required
Permit triggers and exempt work for Camp Hill
Camp Hill uses separate zoning and building permit forms. Zoning permit form covers erection or alteration of structures, demolition, use or change of use, nonconforming use changes, and sidewalk or driveway additions or reconstruction. Building permit packet requires zoning approval first where applicable.
Note: Camp Hill does not publish a consolidated exempt-work list on the main permit page. The zoning and building forms instead describe the categories that require filing. Because the borough uses separate zoning and building review tracks, applicants should confirm any claimed exemption directly with Codes Enforcement & Zoning before proceeding.
- Zoning permit where required
- Building permit application
- Tax parcel number
- Owner signature
- Contractor information
- Two sets of detailed construction plans
- Floodplain supplement if applicable
- Other related permit applications and fees (dumpster, stormwater, curb cut, sewer lateral, sign permits when applicable)
- Building code
- Pennsylvania UCC enforced locally with borough zoning review and third-party code review
- Permit validity
- Construction must begin within 180 days of issuance or the permit becomes invalid.
- Owner-builder
- Application may be made by owner, lessee, agent, or registered design professional; if not owner, authorization documentation is required.
- Contractor requirements
- Pennsylvania HICPA registration applies to covered home improvement contractors; Camp Hill application collects contractor details and relies on third-party agency review under the PA UCC.
Source: Codes Enforcement & Zoning ↗
Application process
Typical processing: Third-party building permit plan reviews are stated as 14 to 30 days.
- 01 Determine whether the project needs zoning approval, building permit review, or both.
- 02 Submit the zoning permit application where required and secure zoning approval first.
- 03 Complete the building permit application and provide the required tax parcel number, owner signature, contractor information, and two sets of construction plans.
- 04 Submit the package and borough fees to the Borough Administrative Office.
- 05 The Building Code Official forwards the file to the borough's approved third-party review agency.
- 06 After approval, pay the third-party review and inspection charges when the permit is picked up.
- 07 Do not start work until the official building permit is issued; complete required inspections and final approval before certificate of use and occupancy.
Typical processing time: Third-party building permit plan reviews are stated as 14 to 30 days.
Source: Codes Enforcement & Zoning ↗
Fee schedule
Camp Hill building permit fees
Borough fees are paid with application submission; third-party review and inspection fees are paid at permit pickup
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Through Approved Code Services after permit issuance (phone)
- Scheduling deadline
- 24-hour notice required before all inspections
Typical sequence: Borough intake, third-party plan review, permit issuance, required progress inspections, final inspection, then certificate of use and occupancy
Source: Codes Enforcement & Zoning ↗
Frequently asked
Common questions about Camp Hill permits
01 Do I need a building permit in Camp Hill, PA? ▸
02 How much does a building permit cost in Camp Hill, PA? ▸
03 How do I apply for a building permit in Camp Hill, PA? ▸
04 How long does it take to get a building permit in Camp Hill, PA? ▸
05 How do I schedule a building inspection in Camp Hill, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Codes Enforcement & Zoning before applying. Jaspector is not legal advice.