When a permit is required
Permit triggers and exempt work for Spring Township
Building permits are required for most construction projects, including new homes and businesses, additions, detached accessory structures, structural alterations, egress alterations, creating habitable space, decks, roofs over decks or porches, enclosing decks or porches, pools, and many mechanical, electrical, and plumbing repairs or alterations.
- Exempt Wallpapering
- Exempt Painting
- Exempt Tiling
- Exempt Cabinetry
- Exempt Finishing work
- Exempt Siding
- Exempt Replacing shingles
- Exempt Replacing same-size windows and doors
- Correct township application
- Three sets of construction drawings for listed residential building projects
- Associated trade permit applications when plumbing, electrical, or mechanical work is included
- Site plan and structural details as applicable
- Building code
- Pennsylvania UCC. The township deck guide is based on the 2015 IRC for deck details.
- Contractor requirements
- PA contractor registration and applicable trade requirements still apply.
Application process
Typical processing: Building review up to 15 business days; zoning review up to 30 days.
- 01 Review the Township Permits page and choose the correct residential, commercial, mechanical, electrical, or plumbing application.
- 02 Prepare the application package and required plans. New houses, additions, structural alterations, and detached accessory structures over 1,000 square feet require the Building Permit Application with three sets of construction drawings.
- 03 Submit the package to the township in person, by mail, or by fax.
- 04 Township review includes zoning review and building code review. Building review has up to 15 business days and zoning review has up to 30 days.
- 05 After approval, pay fees at permit pickup. The township notes a permit is not issued until the fee is paid.
- 06 Schedule mandatory inspections during construction and before final completion.
Typical processing time: Building review up to 15 business days; zoning review up to 30 days.
Fee schedule
Effective 2026
Permit fees are paid after permit approval at permit pickup; the permit is not issued until fee payment is made.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026) before budgeting.
Required inspections
Scheduling and sequence
- (610) 678-5393 (phone)
- Inspection hours
- Monday through Friday, 8:00 a.m. to 5:00 p.m.
Typical sequence: The deck guide specifically references footing and final inspections. For other building work, sequencing follows permit scope and UCC requirements.
Frequently asked
Common questions about Spring Township permits
01 Do I need a building permit in Spring Township, PA? ▸
02 How much does a building permit cost in Spring Township, PA? ▸
03 How do I apply for a building permit in Spring Township, PA? ▸
04 How long does it take to get a building permit in Spring Township, PA? ▸
05 What work is exempt from building permits in Spring Township, PA? ▸
06 How do I schedule a building inspection in Spring Township, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building & Codes; Code Enforcement Department before applying. Jaspector is not legal advice.