How to apply for a building permit in City of Sheridan, Oregon. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Oregon Residential Specialty Code
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Sheridan Administration

Street address
City Hall, 120 SW Mill Street, Sheridan, OR 97378
Coverage
All properties within the incorporated City of Sheridan.
Online portal
Oregon ePermitting System
Accela
§ 02

When a permit is required

Permit triggers and exempt work for Sheridan

Building Compliance Application required.

Required documents
  • Building Compliance Application
  • One set of construction plans (to scale)
  • Plot plan with property distances
  • Proof of land use verification
  • Subsurface sewage disposal (sanitation) approval (if applicable)
  • Driveway approval (if applicable)
Building code
Oregon Residential Specialty Code
Permit validity
Standard three-week minimum applies for plan review.
§ 03

Application process

Typical processing: Minimum three weeks for plan checks and processing.

  1. 01
    Submit Building Compliance Application to City Hall.
  2. 02
    Provide one set of plans and plot plan showing distances from property lines, existing structures, septic system (if applicable).
  3. 03
    Satisfy pre-permit requirements: land use verification, subsurface sewage disposal, driveway approval, building plan approvals.
  4. 04
    City staff performs plan check.
  5. 05
    Respond to any correction comments and resubmit revised documents.
  6. 06
    Pay remaining fees and obtain permit.
  7. 07
    Minimum three weeks for plan checks and processing.

Typical processing time: Minimum three weeks for plan checks and processing.

Source: City of Sheridan Administration ↗

§ 04

Fee schedule

Sheridan building permit fees

Fee type
Amount
01
Permit fee formula
Plan check and infield inspection fees apply, based on State-approved formulas, calculated per square footage.
§ 05

Required inspections

Scheduling and sequence

Typical sequence: Inspections required for safe construction methods and materials.

§ 06

Frequently asked

Common questions about Sheridan permits

01 Do I need a building permit in Sheridan, OR?
Building Compliance Application required.
02 How much does a building permit cost in Sheridan, OR?
Building permit fees in Sheridan, OR are set by the local building department and vary by project type and valuation. Fees are calculated as: Plan check and infield inspection fees apply, based on State-approved formulas, calculated per square footage..
03 How do I apply for a building permit in Sheridan, OR?
To apply for a building permit in Sheridan, OR, follow these steps: 1. Submit Building Compliance Application to City Hall. 2. Provide one set of plans and plot plan showing distances from property lines, existing structures, septic system (if applicable). 3. Satisfy pre-permit requirements: land use verification, subsurface sewage disposal, driveway approval, building plan approvals. 4. City staff performs plan check. 5. Respond to any correction comments and resubmit revised documents. 6. Pay remaining fees and obtain permit. 7. Minimum three weeks for plan checks and processing.
04 How long does it take to get a building permit in Sheridan, OR?
Building permit processing times in Sheridan, OR typically run Minimum three weeks for plan checks and processing.. Timelines can vary based on project complexity and current department workload.
last verified April 2026 source City of Sheridan Administration ↗ entry id permits/oregon/yamhill/sheridan

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Sheridan Administration before applying. Jaspector is not legal advice.