jaspector
City building permits

City of Dundee

How to apply for a building permit in City of Dundee, Oregon. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Oregon Residential Specialty Code
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Dundee Building Department

Coverage
All properties within the incorporated City of Dundee.
Online portal
Oregon ePermitting System
Accela
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Dundee

All structural, plumbing, and mechanical permits required.

Required documents
  • Residential Energy Additional Measure Selection Form
  • Residential Certificate of Lighting Fixtures Form
  • Rain Screen Acknowledgement Form
  • Moisture-Sensitive Wood Framing Moisture Content form
  • Construction plans
Building code
Oregon Residential Specialty Code
Permit validity
Building official has authority to condition permit issuance on proof of building permit fees, business license fees, system development charges, outstanding liens.
Contractor requirements
Contractor licensing verification required.
§ 03

Application process

Typical processing: Varies by project complexity; plan review contracted out.

  1. 01
    Prepare required forms: Residential Energy Additional Measure Selection Form, Residential Certificate of Lighting Fixtures Form, Rain Screen Acknowledgement Form, Moisture-Sensitive Wood Framing Moisture Content form.
  2. 02
    Submit through Oregon ePermitting system or at city office.
  3. 03
    Submit completed forms with application.
  4. 04
    City staff reviews application (plan review and inspections contracted out to external vendors).
  5. 05
    Respond to any correction comments and resubmit revised documents.
  6. 06
    Pay remaining fees and obtain permit.
  7. 07
    Schedule inspections through contracted vendors.

Typical processing time: Varies by project complexity; plan review contracted out.

Source: City of Dundee Building Department ↗

§ 04

Fee schedule

Dundee building permit fees

Fee type
Amount
01
Permit fee formula
Plan check and infield inspection fees apply

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

Typical sequence: Plan review and inspections contracted out (not performed by city staff directly).

§ 06

Frequently asked

Common questions about Dundee permits

01 Do I need a building permit in Dundee, OR?
All structural, plumbing, and mechanical permits required.
02 How much does a building permit cost in Dundee, OR?
Building permit fees in Dundee, OR are set by the local building department and vary by project type and valuation. Fees are calculated as: Plan check and infield inspection fees apply.
03 How do I apply for a building permit in Dundee, OR?
To apply for a building permit in Dundee, OR, follow these steps: 1. Prepare required forms: Residential Energy Additional Measure Selection Form, Residential Certificate of Lighting Fixtures Form, Rain Screen Acknowledgement Form, Moisture-Sensitive Wood Framing Moisture Content form. 2. Submit through Oregon ePermitting system or at city office. 3. Submit completed forms with application. 4. City staff reviews application (plan review and inspections contracted out to external vendors). 5. Respond to any correction comments and resubmit revised documents. 6. Pay remaining fees and obtain permit. 7. Schedule inspections through contracted vendors.
04 How long does it take to get a building permit in Dundee, OR?
Building permit processing times in Dundee, OR typically run Varies by project complexity; plan review contracted out.. Timelines can vary based on project complexity and current department workload.
last verified April 2026 source City of Dundee Building Department ↗ entry id permits/oregon/yamhill/dundee

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Dundee Building Department before applying. Jaspector is not legal advice.