jaspector
City building permits

City of Epping

How to apply for a building permit in City of Epping, North Dakota. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$75
Last verified
April 2026
On this page 6
§ 01

Permit authority

Epping City Hall

Street address
301 Lawrence Avenue, Epping, ND 58843
Coverage
All properties within the incorporated City of Epping.
Online portal
Epping City Hall
In-Person, Mail, Email
§ 02

When a permit is required

Permit triggers and exempt work for Epping

Building permits required for: construction of new structures, enlargement or alteration of existing structures, repairs or demolition, change of occupancy of buildings or structures, grading or drainage work.

One-story detached accessory structures (tool sheds, playhouses) not exceeding 120 sq ft
Fences under 8.5 feet in height
Retaining walls under 4 feet in height (unless supporting a surcharge)
Sidewalks and driveways
Painting, papering, tiling, carpeting, counter tops, similar finish work
Swing sets and playground equipment
  • Exempt One-story detached accessory structures (tool sheds, playhouses) not exceeding 120 sq ft
  • Exempt Fences under 8.5 feet in height
  • Exempt Retaining walls under 4 feet in height (unless supporting a surcharge)
  • Exempt Sidewalks and driveways
  • Exempt Painting, papering, tiling, carpeting, counter tops, similar finish work
  • Exempt Swing sets and playground equipment

Note: Exempt from building permit does not mean exempt from City zoning and planning requirements. Confirm edge cases with City Hall before proceeding.

Required documents
  • Completed building permit application
  • All required drawings and documentation
  • Complete application information
Building code
Williams County building code standards (2026 North Dakota State Building Code)

Source: Epping City Hall ↗

§ 03

Application process

Typical processing: Processing time varies; contact City Hall for estimates

  1. 01
    Contact Epping City Hall to request building permit application materials
  2. 02
    Complete all application information before submission
  3. 03
    Submit applications with required drawings and documentation
  4. 04
    City reviews applications for compliance with Williams County building code standards
  5. 05
    Submit minimum building permit fee of $75 upon approval
  6. 06
    Building permits required before construction, enlargement, alteration, repair, moving, demolition, or change of occupancy
  7. 07
    Grading or drainage work also requires a permit

Typical processing time: Processing time varies; contact City Hall for estimates

Source: Epping City Hall ↗

§ 04

Fee schedule

Epping building permit fees

Fee type
Amount
01
Minimum permit fee
$75
02
Permit fee formula
Minimum $75; additional fees based on project type and valuation
§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 701-859-5561 (phone)
  • Contact City Hall (inperson)
Inspection hours
Contact City Hall for business hours

Typical sequence: Inspections required as part of permit process; follow Williams County standards

Source: Epping City Hall ↗

§ 06

Frequently asked

Common questions about Epping permits

01 Do I need a building permit in Epping, ND?
Building permits required for: construction of new structures, enlargement or alteration of existing structures, repairs or demolition, change of occupancy of buildings or structures, grading or drainage work.
02 How much does a building permit cost in Epping, ND?
Building permit fees in Epping, ND are set by the local building department and vary by project type and valuation. The minimum permit fee is $75. Fees are calculated as: Minimum $75; additional fees based on project type and valuation.
03 How do I apply for a building permit in Epping, ND?
To apply for a building permit in Epping, ND, follow these steps: 1. Contact Epping City Hall to request building permit application materials 2. Complete all application information before submission 3. Submit applications with required drawings and documentation 4. City reviews applications for compliance with Williams County building code standards 5. Submit minimum building permit fee of $75 upon approval 6. Building permits required before construction, enlargement, alteration, repair, moving, demolition, or change of occupancy 7. Grading or drainage work also requires a permit
04 How long does it take to get a building permit in Epping, ND?
Building permit processing times in Epping, ND typically run Processing time varies; contact City Hall for estimates. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Epping, ND?
Not all construction work requires a permit in Epping, ND. The following work is generally exempt: One-story detached accessory structures (tool sheds, playhouses) not exceeding 120 sq ft; Fences under 8.5 feet in height; Retaining walls under 4 feet in height (unless supporting a surcharge); Sidewalks and driveways; Painting, papering, tiling, carpeting, counter tops, similar finish work; Swing sets and playground equipment. Note: Exempt from building permit does not mean exempt from City zoning and planning requirements. Confirm edge cases with City Hall before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Epping, ND?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Epping, ND via: 701-859-5561, Contact City Hall.
last verified April 2026 source Epping City Hall ↗ entry id permits/north-dakota/williams/epping

Educational reference. Permit rules and fees change — confirm current requirements directly with Epping City Hall before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Williams County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Williams County jurisdictions →