On this page 6
When a permit is required
Permit triggers and exempt work for Goldston
Goldston publishes local planning and zoning applications. County construction permits are required for code-regulated building and trade work because Chatham County performs the building permit and inspection function for Goldston.
- Exempt State building-permit exceptions under G.S. 160D-1110(c) may cover some qualifying work at $40,000 or less that does not involve structural, design, roofing-addition, or fire-code-triggering work.
- Exempt Like-kind electrical fixture and device replacement in one- or two-family dwellings and qualifying same-parameters water heater swaps may be exempt under state law when the statutory licensed-trade conditions are met.
Note: Goldston's public permit page does not publish a separate local exempt-work list.
- Goldston forms for residential zoning compliance, commercial zoning permit, sign, floodplain determination, home occupation, special use permit, rezoning, voluntary annexation, and subdivision-related requests
- County construction permit applications
- Plan submittal requirements
- Owner builder statement
- Workers compensation verification
- Mobile home permit, demolition permit, solar checklist, signs permit submittal, and contractor forms
- Building code
- 2018 North Carolina State Building Code and related state codes
- Permit validity
- County permit validity follows the separate Chatham County Permit Expiration Dates handout effective 2024-01-01. Public text could not be extracted from the file during this review.
- Owner-builder
- Chatham County owner-builder forms and state licensure exemptions govern the construction permit side. Goldston's public page did not publish separate owner-builder rules.
- Contractor requirements
- State licensure rules apply. County permit processing requires contractor and workers compensation documentation where applicable.
Application process
Application → plan check → issuance → inspection → final
- 01 Identify the applicable Goldston planning or zoning form, such as residential zoning compliance, commercial zoning permit, sign, rezoning, floodplain determination, or subdivision-related application.
- 02 Submit through Chatham County's OpenGov portal and select the Goldston version of the application so it routes correctly to town staff and contracted planners.
- 03 Provide the supporting documents called for by the applicable town form or checklist.
- 04 After town zoning or development approval, submit any required county building, trade, demolition, mobile home, or related permit application to Chatham County Central Permitting.
- 05 County staff review plans, verify required documents, collect fees, and issue the construction permit.
- 06 Schedule county inspections during construction, with any needed town-side zoning or planning sign-off handled through Goldston's planning process.
Source: Town of Goldston Planning and Zoning; Chatham County Central Permitting and Building Inspections ↗
Fee schedule
Goldston building permit fees
County credit card transactions add 2.99% plus $0.99 and cash or check is not accepted after 4:00 p.m. Goldston encourages applicants to use OpenGov so applications route to the relevant staff.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- County OpenGov portal (online)
- County phone: 919-542-8293 or 919-545-8403 (phone)
- County email: building.permits@chathamcountync.gov (email)
- Inspection hours
- Goldston office hours are by appointment only. County office hours are Monday through Friday, 8:00 a.m. to 5:00 p.m.
Typical sequence: Town zoning or land-use approval first, then county permit issuance, then county building and trade inspections through final. County residential sequencing requires rough trade approvals before framing and final trade approvals before building final.
Frequently asked
Common questions about Goldston permits
01 Do I need a building permit in Goldston, NC? ▸
02 How much does a building permit cost in Goldston, NC? ▸
03 How do I apply for a building permit in Goldston, NC? ▸
04 What work is exempt from building permits in Goldston, NC? ▸
05 How do I schedule a building inspection in Goldston, NC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Goldston Planning and Zoning; Chatham County Central Permitting and Building Inspections before applying. Jaspector is not legal advice.