When a permit is required
Permit triggers and exempt work for Glens Falls
A building permit is required for all construction, enlargement, alteration, improvement, removal, relocation, demolition, and installation of solid-fuel-burning heating appliances, chimneys, or flues.
- Exempt New residential construction of 1,500 gross square feet or less
- Exempt Alterations costing $20,000 or less that do not involve structural changes or public safety impacts
Note: Exemptions noted on the city application form still require compliance with Uniform Code and Energy Code; confirm edge cases with the Building and Codes office.
- Completed building permit application
- Three sets of plans and specifications
- Plans signed and sealed by NY architect or engineer (unless exempt)
- Liability insurance documentation
- Workers' compensation and disability proof, or CE-200 exemption
- Building code
- NYS International Codes (building, energy, and related codes)
- Permit validity
- Building permits expire 12 months after issuance and become invalid unless work starts within six months; extensions up to 18 months may be allowed for good cause.
- Owner-builder
- Owner-builders must provide proof of workers' compensation and disability insurance or submit a CE-200 exemption form.
- Contractor requirements
- All contractors must submit current certificate of insurance and workers' compensation/disability documentation.
Application process
Typical processing: Varies by permit type and complexity; city review is required before work begins
- 01 Obtain the correct building permit application and fee schedule from the City Building and Codes page.
- 02 Prepare three sets of plans and specifications; plans must be signed and sealed by a NY architect or engineer unless an exemption applies.
- 03 Complete the application with required supporting documentation, liability insurance, and workers' compensation proof or CE-200 exemption.
- 04 Submit the application and materials to the City of Glens Falls Building and Codes office.
- 05 Wait for city review and permit issuance before starting work.
- 06 Schedule inspections with at least 48 hours notice and obtain closeout approval.
Typical processing time: Varies by permit type and complexity; city review is required before work begins
Fee schedule
Glens Falls building permit fees
Applicable fees must be paid at submission; city accepts check or online payment
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 518-761-3848 (phone)
- Scheduling deadline
- At least 48 hours notice required
Typical sequence: Typical sequence: footing/foundation, slab prep, framing, rough systems, fire-resistant work, energy code compliance, manufactured home installation (if applicable), and final inspection.
Frequently asked
Common questions about Glens Falls permits
01 Do I need a building permit in Glens Falls, NY? ▸
02 How much does a building permit cost in Glens Falls, NY? ▸
03 How do I apply for a building permit in Glens Falls, NY? ▸
04 How long does it take to get a building permit in Glens Falls, NY? ▸
05 What work is exempt from building permits in Glens Falls, NY? ▸
06 How do I schedule a building inspection in Glens Falls, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Glens Falls Building and Codes before applying. Jaspector is not legal advice.