On this page 5
When a permit is required
Permit triggers and exempt work for Highland
A permit is required to erect, construct, enlarge, alter, remove, improve, demolish, or convert a building or structure, including many accessory structures and pools.
Note: Contact the Code Enforcer to determine permit requirements for your project.
- Two sets of plans and specifications
- Building permit application
- Logging permit application (if applicable)
- Septic and well permits (if applicable)
- NY-licensed design-professional plans where required for habitable structures
- Driveway permits or approvals from appropriate authority (when applicable)
- Building code
- New York State Uniform Fire Prevention and Building Code
- Contractor requirements
- Contractors must comply with New York State licensing requirements for applicable trades.
Application process
Typical processing: Processing time depends on application completeness and project scope.
- 01 Review the town's permit guide and building requirements.
- 02 Contact the Code Enforcer to discuss your project.
- 03 Obtain a building permit application from the town.
- 04 Prepare required documentation: generally two sets of plans; for habitable structures, NY-licensed design-professional plans where required.
- 05 Complete the application with all required information.
- 06 Submit the application and supporting documentation.
- 07 The Code Enforcer reviews the application.
- 08 Pay permit fees and receive the building permit.
- 09 Schedule inspections as required during construction.
Typical processing time: Processing time depends on application completeness and project scope.
Required inspections
Scheduling and sequence
- 845-557-8203 (phone)
Typical sequence: The owner/applicant must notify the inspector when phases of construction are ready for inspection. A certificate of occupancy will not be issued without posted 911 numbering and required septic/well documentation where applicable.
Frequently asked
Common questions about Highland permits
01 Do I need a building permit in Highland, NY? ▸
02 How do I apply for a building permit in Highland, NY? ▸
03 How long does it take to get a building permit in Highland, NY? ▸
04 How do I schedule a building inspection in Highland, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcer / Building Inspector before applying. Jaspector is not legal advice.