jaspector
City building permits

Town of Putnam Valley

How to apply for a building permit in Town of Putnam Valley, New York. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$75 (for some permit renewals)
Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Putnam Valley Building and Zoning Department

Street address
265 Oscawana Lake Road, Putnam Valley, NY 10579
Coverage
All properties within the Town of Putnam Valley.
§ 02

When a permit is required

Permit triggers and exempt work for Putnam Valley

Building Department handles permitting for new construction, additions, alterations, renovations, repairs, as well as specialized permits for demolition, fences, walls, gas, generators, HVAC, sewer, tents, trees, wells, and other specific categories.

Interior finishes and repairs that do not alter structural elements
  • Exempt Interior finishes and repairs that do not alter structural elements

Note: Exempt work classifications are specific to Putnam Valley code. Confirm edge cases with the Building Department before proceeding.

Required documents
  • Completed building permit application
  • Property and zoning information
  • Description of construction work
  • Floodplain indication
  • Owner or authorized agent signature
  • Putnam County contractor information and license number
  • Asbestos survey or certificate (if required for demolition, renovation, or alteration)
  • REScheck certification (if required for renovation)
Building code
New York State Uniform Fire Prevention and Building Code, New York State Energy Code
Permit validity
Varies by permit type; renewal fees are half of original fee in second year (minimum $75), then full fee thereafter.
Owner-builder
Owners are responsible for outstanding town charges and consultant fees associated with the permit.
Contractor requirements
Contractors must hold a valid Putnam County license.

Source: Town of Putnam Valley Building and Zoning Department ↗

§ 03

Application process

Typical processing: 2-4 weeks for initial review, longer if municipal board approvals required.

  1. 01
    Review the applicable permit forms and current fee schedule.
  2. 02
    Prepare completed permit application with property, zoning, construction description, and floodplain information.
  3. 03
    Include Putnam County contractor information and license number.
  4. 04
    Obtain any required zoning approvals or asbestos certifications.
  5. 05
    Prepare REScheck certification if project is a renovation requiring energy code compliance.
  6. 06
    Submit all documents in person Monday-Friday, 10:00 AM to 3:00 PM. Incomplete applications will not be accepted.
  7. 07
    Pay applicable permit fees based on estimated construction cost and project type.
  8. 08
    Schedule inspections and obtain certificates of occupancy or compliance upon completion.

Typical processing time: 2-4 weeks for initial review, longer if municipal board approvals required.

Source: Town of Putnam Valley Building and Zoning Department ↗

§ 04

Fee schedule

Effective January 21, 2026

Fee type
Amount
01
Minimum permit fee
$75 (for some permit renewals)
02
Plan check fee
Included in permit fee
03
Permit fee formula
$20 per $1,000 of estimated construction cost; many categories use square-foot valuation schedules
04
Trade permit fee
Electrical: $50; Gas: varies; Plumbing: $75 for five fixtures, $15 each additional; HVAC: $75 per unit
05
Reinspection fee
Included in permit terms
06
Penalty (no permit)
$1,500 or as determined by Town Board for work undertaken or completed before obtaining permit

Residential single-family dwellings: $130/sq ft; Two-family: $200/sq ft; Accessory buildings: $50/sq ft; Finished basements: $75/sq ft; Interior renovations: $65/sq ft residential, $75/sq ft commercial; Pools: $75; Demolition: $100 residential; Generator: $75 residential; Fence/wall: $75; Minor grading: $75 residential.

Fees change periodically. Confirm at the official fee schedule ↗ (effective January 21, 2026) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 845-526-2377 (phone)
  • Building Department office (in-person)
Scheduling deadline
Confirm specific intervals with Building Department for project type
Inspection hours
Monday-Friday, 10:00 AM to 3:00 PM

Typical sequence: Department performs fire and safety inspections and permitting reviews. Confirm final inspection and certificate requirements by permit type with the department.

Source: Town of Putnam Valley Building and Zoning Department ↗

§ 06

Frequently asked

Common questions about Putnam Valley permits

01 Do I need a building permit in Putnam Valley, NY?
Building Department handles permitting for new construction, additions, alterations, renovations, repairs, as well as specialized permits for demolition, fences, walls, gas, generators, HVAC, sewer, tents, trees, wells, and other specific categories.
02 How much does a building permit cost in Putnam Valley, NY?
Building permit fees in Putnam Valley, NY are set by the local building department and vary by project type and valuation. The minimum permit fee is $75 (for some permit renewals). Fees are calculated as: $20 per $1,000 of estimated construction cost; many categories use square-foot valuation schedules. Plan check fee: Included in permit fee.
03 How do I apply for a building permit in Putnam Valley, NY?
To apply for a building permit in Putnam Valley, NY, follow these steps: 1. Review the applicable permit forms and current fee schedule. 2. Prepare completed permit application with property, zoning, construction description, and floodplain information. 3. Include Putnam County contractor information and license number. 4. Obtain any required zoning approvals or asbestos certifications. 5. Prepare REScheck certification if project is a renovation requiring energy code compliance. 6. Submit all documents in person Monday-Friday, 10:00 AM to 3:00 PM. Incomplete applications will not be accepted. 7. Pay applicable permit fees based on estimated construction cost and project type. 8. Schedule inspections and obtain certificates of occupancy or compliance upon completion.
04 How long does it take to get a building permit in Putnam Valley, NY?
Building permit processing times in Putnam Valley, NY typically run 2-4 weeks for initial review, longer if municipal board approvals required.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Putnam Valley, NY?
Not all construction work requires a permit in Putnam Valley, NY. The following work is generally exempt: Interior finishes and repairs that do not alter structural elements. Note: Exempt work classifications are specific to Putnam Valley code. Confirm edge cases with the Building Department before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Putnam Valley, NY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Putnam Valley, NY via: 845-526-2377, Building Department office. Confirm specific intervals with Building Department for project type.
last verified April 2026 source Town of Putnam Valley Building and Zoning Department ↗ entry id permits/new-york/putnam/putnam-valley

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Putnam Valley Building and Zoning Department before applying. Jaspector is not legal advice.