On this page 5
When a permit is required
Permit triggers and exempt work for Wellsville
Building permits are required for most construction and alterations.
Note: Contact the code-enforcement office for exempt-work determinations.
- Building Permit Application
- Electrical Permit (for electrical work)
- Site plan
- Construction plans
- Building code
- New York State Uniform Code (adopted via Local Law No. 2 of 2015)
Application process
Application → plan check → issuance → inspection → final
- 01 Use the Code Enforcement page/forms page to obtain the proper application.
- 02 Submit the Building Permit Application before starting work.
- 03 For electrical work requiring a permit, file the electrical application detailing the scope before work begins.
- 04 Schedule inspections with the code-enforcement office.
- 05 For rental property, separately comply with the village's residential rental property registration requirements where applicable.
Required inspections
Scheduling and sequence
- Code Enforcement Office: 585-610-3076 (phone)
Typical sequence: Electrical work must be inspected before concealment after permit issuance where applicable. The village will not re-energize an electrical service terminated for more than 30 days without an inspection.
Frequently asked
Common questions about Wellsville permits
01 Do I need a building permit in Wellsville, NY? ▸
02 How do I apply for a building permit in Wellsville, NY? ▸
03 How do I schedule a building inspection in Wellsville, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Wellsville Code Enforcement before applying. Jaspector is not legal advice.