jaspector
City building permits

Town of Alfred

How to apply for a building permit in Town of Alfred, New York. Permit authority, application steps, fees, and inspection requirements.

Code adoption
New York State Uniform Code
Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Alfred Codes Enforcement / MACE

Street address
6340 Shaw Road, PO Box 230, Alfred Station, NY 14803
Coverage
All properties within the Town of Alfred.
§ 02

When a permit is required

Permit triggers and exempt work for Alfred

All construction over 64 square feet requires both a zoning permit and a building permit.

Note: Contact the Town of Alfred Codes Enforcement office for exempt-work determinations.

Required documents
  • Zoning-permit application
  • Building-permit application
  • Site plan
  • Construction plans
  • Applicant/owner information
  • Occupancy and use information
  • Scope of work
  • Plans and specifications
  • Septic approval from Allegany County Health Department (if required)
Building code
New York State Uniform Code
Contractor requirements
Standard insurance and workers' compensation compliance materials are required when wages are paid.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Obtain both zoning-permit and building-permit forms from the town website or Town Clerk.
  2. 02
    Submit the zoning application with site plan and fee.
  3. 03
    For most projects, attach the issued zoning permit to the building-permit application.
  4. 04
    Submit three copies of the building-permit application and attachments to the Town Clerk or Code Enforcement Officer.
  5. 05
    Provide septic-system approval from the Allegany County Health Department before a building permit is issued where required.
  6. 06
    Await code review and then schedule inspections with MACE.

Source: Town of Alfred Codes Enforcement / MACE ↗

§ 04

Fee schedule

Alfred building permit fees

Fee type
Amount
01
Permit fee formula
Based on cost of construction

Zoning permit fee: $10.00. Building permit fee varies based on construction cost.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • MACE: 585-365-2928 (phone)

Typical sequence: Inspections are handled through MACE. The town site does not publish inspection windows or a milestone schedule; applicants should coordinate directly with MACE.

§ 06

Frequently asked

Common questions about Alfred permits

01 Do I need a building permit in Alfred, NY?
All construction over 64 square feet requires both a zoning permit and a building permit.
02 How much does a building permit cost in Alfred, NY?
Building permit fees in Alfred, NY are set by the local building department and vary by project type and valuation. Fees are calculated as: Based on cost of construction.
03 How do I apply for a building permit in Alfred, NY?
To apply for a building permit in Alfred, NY, follow these steps: 1. Obtain both zoning-permit and building-permit forms from the town website or Town Clerk. 2. Submit the zoning application with site plan and fee. 3. For most projects, attach the issued zoning permit to the building-permit application. 4. Submit three copies of the building-permit application and attachments to the Town Clerk or Code Enforcement Officer. 5. Provide septic-system approval from the Allegany County Health Department before a building permit is issued where required. 6. Await code review and then schedule inspections with MACE.
04 How do I schedule a building inspection in Alfred, NY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Alfred, NY via: MACE: 585-365-2928.
last verified April 2026 source Town of Alfred Codes Enforcement / MACE ↗ entry id permits/new-york/allegany/alfred-town

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Alfred Codes Enforcement / MACE before applying. Jaspector is not legal advice.