On this page 6
When a permit is required
Permit triggers and exempt work for Los Lunas
Any structure over 120 square feet. All new construction, additions, alterations, or change of use. Commercial projects require full multi-department review.
- Exempt Structures 120 square feet and under (Village development plan review not required; confirm state CID requirements separately)
- Exempt Ordinary maintenance and repair not affecting structural elements
- Exempt Painting, flooring, cabinet work, and other cosmetic non-structural work
Note: Confirm specific exemptions with Village Planning Division or NM CID.
- Completed Development Plan Application
- Site plan with property boundaries, structure location, setbacks
- For commercial: fire plans, drainage/utility/landscape plans, parking layout
- Zoning classification confirmation
- Floodplain map check
- Contractor CID license information
- For state road access: NMDOT driveway permit
- Building code
- 2021 NM Residential Building Code, 2021 NM Commercial Building Code, 2021 Uniform Mechanical Code, 2021 Uniform Plumbing Code, 2020 NEC. Los Lunas local code: Title 15 Buildings and Construction; Zoning Ordinance 481.
- Permit validity
- Not publicly stated; contact Planning Division. State CID permits typically valid 12 months.
- Owner-builder
- Governed by NM CID homeowner permit rules. Contact CID at 505-222-9800.
- Contractor requirements
- NM CID license required (GB-2 residential, GB-98 general building, or applicable trade license). $10,000 bond.
Application process
Typical processing: Not publicly stated; contact Village at 505-839-3840 or planning@loslunasnm.gov
- 01 Determine project type (residential or commercial) and whether a Development Plan Application is required.
- 02 Any structure exceeding 120 square feet requires a Development Plan Application before construction approval.
- 03 Download or obtain the Development Plan Application from the Village forms page.
- 04 For commercial projects, gather: zoning and floodplain compliance documents, site plan, sign permit (if applicable), water consumption assessment, fire department approvals (fire, sprinkler, kitchen hood, clean agent plans), drainage, utility, landscaping, parking, lighting, and dumpster placement plans.
- 05 For residential projects, gather: zoning and floodplain compliance documents, site plan, utility placement plan.
- 06 Submit complete application package by email to planning@loslunasnm.gov or in person at Village Hall, 660 Main St. NW.
- 07 Village conducts multi-department review (Community Development, Public Works, Fire Marshal).
- 08 Upon Village approval, contact NM CID Albuquerque (505-222-9800) for the state building permit.
- 09 For driveway or curb cut on a state road, contact NM Department of Transportation for a separate permit.
- 10 CID issues state building permit after plan review; construction proceeds with CID inspections.
- 11 For food service establishments, contact NM Environment Department Los Lunas office at 505-841-5280.
Typical processing time: Not publicly stated; contact Village at 505-839-3840 or planning@loslunasnm.gov
Source: Village of Los Lunas Community Development Department (Planning Division) ↗
Fee schedule
Effective January 23, 2024
Village fees payable at Village Hall, 660 Main St. NW.
Fees change periodically. Confirm at the official fee schedule ↗ (effective January 23, 2024) before budgeting.
Required inspections
Scheduling and sequence
- NM CID Albuquerque office at 505-222-9800 (phone)
- Village Fire Marshal at 505-866-2116 (fire system inspections on commercial projects) (phone)
- Inspection hours
- NM CID by appointment; contact 505-222-9800. Village offices: contact 505-839-3840 for hours.
Typical sequence: Foundation; framing; rough mechanical/electrical/plumbing (MEP); insulation; final; Certificate of Occupancy.
Source: Village of Los Lunas Community Development Department (Planning Division) ↗
Frequently asked
Common questions about Los Lunas permits
01 Do I need a building permit in Los Lunas, NM? ▸
02 How do I apply for a building permit in Los Lunas, NM? ▸
03 How long does it take to get a building permit in Los Lunas, NM? ▸
04 What work is exempt from building permits in Los Lunas, NM? ▸
05 How do I schedule a building inspection in Los Lunas, NM? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Los Lunas Community Development Department (Planning Division) before applying. Jaspector is not legal advice.