When a permit is required
Permit triggers and exempt work for Dexter
New construction, additions, alterations, and trade work require permits. Agricultural structures may be exempt if on bona fide farm property.
Note: Agricultural exemptions apply in Dexter area. Confirm with City Clerk or NM CID depending on which authority issues permits.
- Completed permit application (city or CID depending on authority)
- Site plan
- Construction drawings
- Contractor license information
- Building code
- NM statewide codes apply (2021 NMRBC, NMCBC, 2020 NEC, etc.). Dexter-specific code amendments, if any, are not confirmed from public sources.
- Permit validity
- Per NM state rule (14.5.2 NMAC), 180 days from issuance without commencement; extension available by request.
- Owner-builder
- NM state owner-builder rules (14.5.2.18 NMAC) apply.
- Contractor requirements
- NM CID licenses required. GB-2 (residential), GB-98 (commercial), specialty trade licenses.
Application process
Typical processing: Unknown; confirm with city or CID depending on which authority applies.
- 01 Call the Dexter City Clerk at (575) 734-5452 and ask: (a) does the city issue its own building permits, or are NM CID permits required?
- 02 If the city issues its own permits: obtain application forms from City Hall, prepare site plan, construction drawings, and contractor information, and submit in person at City Hall, 201 S. Main St.
- 03 If the NM CID issues permits for Dexter: contact the CID Roswell regional office at (575) 624-6060 or CID.PERMITHELP@rld.nm.gov to begin the CID permit application process.
- 04 Verify any local zoning or land use requirements with the City Clerk before beginning construction.
- 05 Obtain permit, post on site, and schedule required inspections.
- 06 Pass all inspections; receive final approval.
Typical processing time: Unknown; confirm with city or CID depending on which authority applies.
Required inspections
Scheduling and sequence
- City Clerk at (575) 734-5452 or NM CID Roswell at (575) 624-6060 (phone)
- Inspection hours
- City Hall business hours (confirm) or CID standard business hours
Typical sequence: Standard NM sequence (foundation, rough, framing, insulation, final). Confirm required inspections at time of permit issuance.
Frequently asked
Common questions about Dexter permits
01 Do I need a building permit in Dexter, NM? ▸
02 How do I apply for a building permit in Dexter, NM? ▸
03 How long does it take to get a building permit in Dexter, NM? ▸
04 How do I schedule a building inspection in Dexter, NM? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Dexter -- City Clerk / Administration before applying. Jaspector is not legal advice.