When a permit is required
Permit triggers and exempt work for Hillsborough Township
Building permits required for new construction, additions, and most renovation work within Hillsborough Township.
- Exempt Ordinary maintenance and minor repairs
- Exempt Painting, wallpapering, trim work
- Exempt Flooring installation
- Exempt Window replacement in same rough opening
- Exempt Siding repair (non-polypropylene)
- Exempt Garden sheds 200 sq ft or less with no utilities
Note: Exemption from permit does not mean exempt from zoning and planning requirements. All work must comply with applicable codes.
- Completed UCC F100 Construction Permit Application
- Two complete sets of scaled plans
- Plans signed/sealed by NJ licensed architect or signed/dated by property owner
- Signatures required on all pages
- Plot plan or property survey
- Manufacturer specifications/installation manuals (2 sets)
- Copy of contractor licenses or certificates
- Building code
- Uniform Construction Code (UCC)
- Permit validity
- 12 months from date of last inspection
- Owner-builder
- Plans may be owner-prepared for owner-occupied single-family dwellings.
- Contractor requirements
- Licensed NJ architects or engineers required for commercial projects.
Application process
Typical processing: 20 business days for complete applications
- 01 Permits may be dropped off Monday-Friday or mailed to Municipal Building (attention Construction Department).
- 02 Submit completed UCC F100 application with all applicable technical sections.
- 03 Provide two complete sets of scaled plans signed and sealed by NJ licensed Architect or signed and dated by property owner.
- 04 Signatures required on all pages.
- 05 Include plot plan or property survey.
- 06 Provide manufacturer specifications/installation manuals (2 sets).
- 07 Include copy of contractor licenses or certificates.
- 08 Incomplete applications will not be accepted.
Typical processing time: 20 business days for complete applications
Fee schedule
Hillsborough Township building permit fees
State training surcharge fees apply. Specific fee schedule available from Construction Department.
Required inspections
Scheduling and sequence
- SDL Portal (24/7) (online)
- 908-369-4313 (phone)
- Scheduling deadline
- Request through SDL Portal or during business hours
- Inspection hours
- Monday-Friday, 8:00 AM - 4:30 PM; Permit Pickup: 8:00 AM - 3:00 PM; Inspection Hours: 8:00 AM - 3:00 PM
Typical sequence: Required inspections typically include: Foundation/footing, Framing, Rough electrical/plumbing/mechanical, Insulation, and Final inspections.
Frequently asked
Common questions about Hillsborough Township permits
01 Do I need a building permit in Hillsborough Township, NJ? ▸
02 How much does a building permit cost in Hillsborough Township, NJ? ▸
03 How do I apply for a building permit in Hillsborough Township, NJ? ▸
04 How long does it take to get a building permit in Hillsborough Township, NJ? ▸
05 What work is exempt from building permits in Hillsborough Township, NJ? ▸
06 How do I schedule a building inspection in Hillsborough Township, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Construction Department (Building Department) before applying. Jaspector is not legal advice.