When a permit is required
Permit triggers and exempt work for Franklin Township
A building permit is required for most construction within Franklin Township.
- Exempt Painting, wallpapering, trim work (interior/exterior)
- Exempt Flooring material repair, replacement, or installation
- Exempt Cabinet installation (non-structural)
- Exempt Siding repair or replacement with like material not exceeding 25% of total exterior wall
- Exempt Window/door replacement in same rough opening without altering dimensions
- Exempt Glass replacement in existing windows/doors
- Exempt Screen repair/replacement
- Exempt Gutter and leader repair/replacement
- Exempt Garden-type utility sheds 200 sq ft or less, 10 feet or less in height, with no utility connections
- Exempt Ordinary maintenance and minor repairs
Note: Exemption from permit does not mean exempt from zoning and planning requirements. All work must comply with applicable codes.
- Completed UCC F100 Construction Permit Application
- Two sets of construction plans
- Plot plan showing all existing and proposed structures
- Distances to all lot lines
- Location of easements
- Building code
- Uniform Construction Code (UCC)
- Permit validity
- 12 months from date of last inspection
- Owner-builder
- Owner-prepared plans permitted for owner-occupied single-family dwellings.
- Contractor requirements
- Licensed NJ architects or engineers required for commercial projects.
Application process
Typical processing: 20 business days for complete applications
- 01 Contact Construction Department to determine if permit is required.
- 02 Submit completed UCC F100 application with all applicable subcode technical sections.
- 03 Provide two sets of construction plans (may be owner-prepared for owner-occupied single-family dwelling; otherwise must be sealed by NJ licensed architect or engineer).
- 04 Submit plot plan showing all existing and proposed structures with distances to lot lines.
- 05 Obtain prior approvals from other departments as required (Zoning, Health, Engineering).
- 06 Pay applicable fees.
Typical processing time: 20 business days for complete applications
Fee schedule
Franklin Township building permit fees
Specific fee schedule available at Construction Department
Required inspections
Scheduling and sequence
- 732-873-2500 (phone)
- Scheduling deadline
- 24 hours in advance recommended
- Inspection hours
- Monday-Friday, 8:00 AM to 4:30 PM
Typical sequence: Required inspections typically include: footing, foundation, framing, rough electrical/plumbing/fire, insulation, and final inspections.
Frequently asked
Common questions about Franklin Township permits
01 Do I need a building permit in Franklin Township, NJ? ▸
02 How much does a building permit cost in Franklin Township, NJ? ▸
03 How do I apply for a building permit in Franklin Township, NJ? ▸
04 How long does it take to get a building permit in Franklin Township, NJ? ▸
05 What work is exempt from building permits in Franklin Township, NJ? ▸
06 How do I schedule a building inspection in Franklin Township, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Construction Department before applying. Jaspector is not legal advice.