When a permit is required
Permit triggers and exempt work for Pompton Lakes
Building permits are required for all construction within Borough of Pompton Lakes.
Note: Property owner's responsibility to confirm permit requirements with Building Department. NJ UCC exempt work provisions apply.
- NJ UCC F100 Construction Permit Application
- Property survey to scale for zoning applications
- Copies must be exact same size as original survey
- NJ DEP Permit-by-Rule documentation where applicable
- Decks, Dumpsters/Storage Containers, Electrical work, Fences, EV/Tesla Charging Stations require permits
- All pools over 24 inches deep (above ground, in-ground, inflatable/temporary) require permits
- Hot Tubs, Water Heaters, Kitchen and Bathroom renovations, Plumbing work, Driveways, Sheds, Steps require permits
- Change of Use/Tenant, Tank removal and abandonment require permits
- Building code
- New Jersey Uniform Construction Code
- Permit validity
- Permit is valid for 12 months from date of last inspection per NJ UCC.
Application process
Typical processing: Varies; contact Building Department for specific timelines
- 01 Create account on FTG Portal or download application forms.
- 02 Complete Construction Permit Application (NJ UCC F100).
- 03 Complete appropriate subcode technical sections.
- 04 For exterior projects: Complete Zoning Application (requires property survey to scale).
- 05 Submit all required documentation.
- 06 Pay applicable fees.
Typical processing time: Varies; contact Building Department for specific timelines
Fee schedule
Pompton Lakes building permit fees
Contact Building Department for current fee schedule.
Required inspections
Scheduling and sequence
- building@pomptonlakes-nj.gov (email)
- Scheduling deadline
- All inspection requests must be in writing. Wait for Building Department Staff confirmation before inspection is scheduled. If you do not receive confirmation, you are not on the schedule.
- Inspection hours
- Monday through Friday 3:30 to 6:00 p.m.
Typical sequence: Required information for email: Property address, permit number, requested schedule dates. Inspection Request Form available for download on website. Continued Certificate of Occupancy (CCO) required for resale of residential homes and businesses, and for change of tenancy; allow three weeks to complete the process.
Frequently asked
Common questions about Pompton Lakes permits
01 Do I need a building permit in Pompton Lakes, NJ? ▸
02 How much does a building permit cost in Pompton Lakes, NJ? ▸
03 How do I apply for a building permit in Pompton Lakes, NJ? ▸
04 How long does it take to get a building permit in Pompton Lakes, NJ? ▸
05 How do I schedule a building inspection in Pompton Lakes, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department (Construction Department) before applying. Jaspector is not legal advice.