On this page 6
When a permit is required
Permit triggers and exempt work for Passaic
Building permits are required for all construction within the City of Passaic.
- Exempt Minor work and maintenance for one/two family dwellings may have reduced requirements
Note: Specific exemptions per NJ Uniform Construction Code. Contact Code Enforcement & Zoning Department for determination.
- NJ UCC F100 Construction Permit Application
- F110 Building Subcode Technical Section (as applicable)
- F120 Electrical Subcode Technical Section (as applicable)
- F130 Plumbing Subcode Technical Section (as applicable)
- F140 Fire Technical Section (as applicable)
- Consent to Undertake Proposed Work (F101-CUPW)
- Certificate of Homeowner Lead Abatement (F101-LEAD) where applicable
- Site plans and construction drawings
- Zoning approval required before permit issuance
- Demolition Checklist for demolition projects
- New Construction Checklist for new builds
- Checklist for Renovations & Additions
- Tenant Fit Out Checklist for commercial tenant improvements
- Building code
- New Jersey Uniform Construction Code
- Permit validity
- Permit is valid for 12 months from date of last inspection per NJ UCC.
- Contractor requirements
- Commercial contractor registration required for commercial work.
Application process
Typical processing: Varies; contact Code Enforcement & Zoning Department for specific timelines
- 01 Complete Construction Permit Application (F100).
- 02 Complete appropriate subcode technical sections.
- 03 Submit required supporting documentation.
- 04 Commercial contractor registration required for commercial work.
- 05 Pay applicable fees.
Typical processing time: Varies; contact Code Enforcement & Zoning Department for specific timelines
Source: Code Enforcement & Zoning Department (Construction Department) ↗
Fee schedule
Passaic building permit fees
Fees must be paid at time of permit issuance.
Required inspections
Scheduling and sequence
- Code Enforcement & Zoning Department (973-365-5521) (phone)
Typical sequence: Inspections coordinated through Code Enforcement Department. Passaic Valley Water Commission Inspection may be required. PVSC Sewer Connection Application may be required for sewer work. Cross Connection Control Device Performance Testing required where applicable.
Source: Code Enforcement & Zoning Department (Construction Department) ↗
Frequently asked
Common questions about Passaic permits
01 Do I need a building permit in Passaic, NJ? ▸
02 How much does a building permit cost in Passaic, NJ? ▸
03 How do I apply for a building permit in Passaic, NJ? ▸
04 How long does it take to get a building permit in Passaic, NJ? ▸
05 What work is exempt from building permits in Passaic, NJ? ▸
06 How do I schedule a building inspection in Passaic, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement & Zoning Department (Construction Department) before applying. Jaspector is not legal advice.