When a permit is required
Permit triggers and exempt work for Bloomfield
Zoning permit and construction permit required for new construction, additions, enclosing porches, finishing basements/attics, decks, pools, fences, retaining walls, driveways, walkways, patios, generators, HVAC, sheds, and commercial change of use.
- Exempt Routine maintenance including roofing, siding, and window/door replacement (as long as no structural change)
- Exempt Small repairs that do not structurally change the building
Note: Confirm exemption status with the Construction Department before proceeding.
- Zoning permit application with current property survey
- Construction Permit Application (NJ DCA Form F100) with subcode sections
- Plans/specifications (2 sets residential, 3 sets commercial)
- Commercial plans must be sealed by NJ-licensed professional
- Contractor credentials and insurance verification
- Building code
- NJ Uniform Construction Code (UCC) based on International Building Code (IBC) with NJ-specific amendments
- Permit validity
- NJ UCC permits valid for 12 months from last inspection; work must begin within 12 months of permit issuance.
- Contractor requirements
- All contractors must hold valid NJ registrations and licenses. Commercial plans require NJ-licensed professional seal.
Source: Construction Department ↗
Application process
Typical processing: Zoning permit: 10 business days; Construction permit: 20 business days under NJ UCC for complete applications.
- 01 Apply for zoning permit before construction permit (10 business day review period).
- 02 Submit current property survey with zoning application.
- 03 Submit Construction Permit Application with applicable subcode sections.
- 04 Provide plans: 2 sets for residential, 3 sets for commercial.
- 05 Commercial plans must be signed and sealed by NJ-licensed professional.
- 06 Pay fees including plan review fees.
- 07 Post permit placard visibly from street.
Typical processing time: Zoning permit: 10 business days; Construction permit: 20 business days under NJ UCC for complete applications.
Source: Construction Department ↗
Fee schedule
Effective May 19, 2025
Contact Construction Department for specific fee schedule. Plan review fees typically 20% of permit fee due at submission.
Required inspections
Scheduling and sequence
- (973) 680-4053 (phone)
Typical sequence: Required inspections at various construction phases. Approved plans must be kept on site at all times. Inspector will not conduct inspection without plans on site. Final inspection and Certificate of Occupancy required.
Source: Construction Department ↗
Frequently asked
Common questions about Bloomfield permits
01 Do I need a building permit in Bloomfield, NJ? ▸
02 How much does a building permit cost in Bloomfield, NJ? ▸
03 How do I apply for a building permit in Bloomfield, NJ? ▸
04 How long does it take to get a building permit in Bloomfield, NJ? ▸
05 What work is exempt from building permits in Bloomfield, NJ? ▸
06 How do I schedule a building inspection in Bloomfield, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Construction Department before applying. Jaspector is not legal advice.