On this page 6
§ 01

Permit authority

Upper Township Construction Code Office

Street address
1790 Route 50, Petersburg, NJ 08270
Coverage
All properties within Upper Township.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Upper Township

A building permit is required for all regulated construction within Upper Township.

Ordinary maintenance and repairs
Non-structural finishes
Portable equipment
Minor accessory structures
Certain fencing
  • Exempt Ordinary maintenance and repairs
  • Exempt Non-structural finishes
  • Exempt Portable equipment
  • Exempt Minor accessory structures
  • Exempt Certain fencing

Note: Many exemptions do not apply in designated flood zones. Contact office for guidance on flood zone properties.

Required documents
  • Completed UCC permit application
  • Two sets of construction documents
  • Site plan with dimensions and setbacks
  • Elevation certificate for flood zone properties
  • CAFRA documentation where applicable
  • Proof of contractor licensing
Building code
New Jersey Uniform Construction Code (UCC), N.J.A.C. 5:23
Permit validity
All permits are valid for 12 months from the date of the last inspection.
Owner-builder
Property owners may perform work on their own primary residence with certain restrictions.
Contractor requirements
Licensed contractors required for all regulated work. Verify contractor licensing through NJ DCA.
§ 03

Application process

Typical processing: 2-4 weeks for standard permits; longer for CAFRA-regulated projects

  1. 01
    Submit completed UCC permit applications
  2. 02
    Provide two sets of construction documents
  3. 03
    Include site plan with dimensions and setbacks
  4. 04
    Submit elevation certificates for flood zone properties
  5. 05
    Provide CAFRA documentation where applicable
  6. 06
    Verify contractor licensing
  7. 07
    Pay applicable permit fees
  8. 08
    Obtain zoning approval
  9. 09
    Schedule inspections

Typical processing time: 2-4 weeks for standard permits; longer for CAFRA-regulated projects

Source: Upper Township Construction Code Office ↗

§ 04

Fee schedule

Upper Township building permit fees

Fee type
Amount
01
Permit fee formula
Based on NJ DCA UCC Fee Schedule calculated on construction valuation

Contact Upper Township Construction Code Office for current fee information

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
24-hour notice required for inspections

Typical sequence: Rough and final inspections required. Trade inspections for mechanical systems. Certificate of Occupancy/Compliance required.

§ 06

Frequently asked

Common questions about Upper Township permits

01 Do I need a building permit in Upper Township, NJ?
A building permit is required for all regulated construction within Upper Township.
02 How much does a building permit cost in Upper Township, NJ?
Building permit fees in Upper Township, NJ are set by the local building department and vary by project type and valuation. Fees are calculated as: Based on NJ DCA UCC Fee Schedule calculated on construction valuation.
03 How do I apply for a building permit in Upper Township, NJ?
To apply for a building permit in Upper Township, NJ, follow these steps: 1. Submit completed UCC permit applications 2. Provide two sets of construction documents 3. Include site plan with dimensions and setbacks 4. Submit elevation certificates for flood zone properties 5. Provide CAFRA documentation where applicable 6. Verify contractor licensing 7. Pay applicable permit fees 8. Obtain zoning approval 9. Schedule inspections
04 How long does it take to get a building permit in Upper Township, NJ?
Building permit processing times in Upper Township, NJ typically run 2-4 weeks for standard permits; longer for CAFRA-regulated projects. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Upper Township, NJ?
Not all construction work requires a permit in Upper Township, NJ. The following work is generally exempt: Ordinary maintenance and repairs; Non-structural finishes; Portable equipment; Minor accessory structures; Certain fencing. Note: Many exemptions do not apply in designated flood zones. Contact office for guidance on flood zone properties. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Upper Township, NJ?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Upper Township, NJ via: (609) 628-2011, Upper Township Construction Code Office. 24-hour notice required for inspections.
last verified April 2026 source Upper Township Construction Code Office ↗ entry id permits/new-jersey/cape-may/upper-township

Educational reference. Permit rules and fees change — confirm current requirements directly with Upper Township Construction Code Office before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Cape May County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Cape May County jurisdictions →