§ 01

Permit authority

North Wildwood Construction Code Office

Street address
901 Atlantic Avenue, North Wildwood, NJ 08260
Coverage
All properties within the City of North Wildwood.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for North Wildwood

A building permit is required for all regulated construction within North Wildwood.

Ordinary repairs
Cosmetic improvements
Portable equipment
Small accessory structures
Fences (height restrictions apply)
  • Exempt Ordinary repairs
  • Exempt Cosmetic improvements
  • Exempt Portable equipment
  • Exempt Small accessory structures
  • Exempt Fences (height restrictions apply)

Note: North Wildwood is entirely coastal; flood zone requirements apply to most properties. Verify exemption status with Construction Official.

Required documents
  • Completed UCC subcode permit applications
  • Two sets of construction plans
  • Site plan with setbacks
  • Elevation certificate for flood zone properties
  • CAFRA permits or exemptions
  • Proof of contractor licensing
Building code
New Jersey Uniform Construction Code (UCC), N.J.A.C. 5:23
Permit validity
All permits are valid for 12 months from the date of the last inspection.
Owner-builder
Property owners may perform work on their own primary residence with certain restrictions.
Contractor requirements
Licensed contractors required for regulated work. Verify contractor licensing through NJ DCA.
§ 03

Application process

Typical processing: 2-4 weeks for standard permits; longer for CAFRA-regulated projects

  1. 01
    Complete all UCC subcode permit applications
  2. 02
    Submit construction plans (two sets minimum)
  3. 03
    Provide site plan with setbacks
  4. 04
    Submit elevation certificate for flood zone properties
  5. 05
    Include CAFRA permits or exemptions
  6. 06
    Verify contractor licensing
  7. 07
    Pay permit fees
  8. 08
    Obtain zoning clearance
  9. 09
    Schedule inspections

Typical processing time: 2-4 weeks for standard permits; longer for CAFRA-regulated projects

Source: North Wildwood Construction Code Office ↗

§ 04

Fee schedule

North Wildwood building permit fees

Fee type
Amount
01
Permit fee formula
Based on NJ UCC Fee Schedule calculated on construction valuation

Contact North Wildwood Construction Code Office for specific fee schedule

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
24-48 hours in advance recommended

Typical sequence: Required inspections at foundation, rough, and final phases. Trade inspections separate. Certificate of Occupancy required.

§ 06

Frequently asked

Common questions about North Wildwood permits

01 Do I need a building permit in North Wildwood, NJ?
A building permit is required for all regulated construction within North Wildwood.
02 How much does a building permit cost in North Wildwood, NJ?
Building permit fees in North Wildwood, NJ are set by the local building department and vary by project type and valuation. Fees are calculated as: Based on NJ UCC Fee Schedule calculated on construction valuation.
03 How do I apply for a building permit in North Wildwood, NJ?
To apply for a building permit in North Wildwood, NJ, follow these steps: 1. Complete all UCC subcode permit applications 2. Submit construction plans (two sets minimum) 3. Provide site plan with setbacks 4. Submit elevation certificate for flood zone properties 5. Include CAFRA permits or exemptions 6. Verify contractor licensing 7. Pay permit fees 8. Obtain zoning clearance 9. Schedule inspections
04 How long does it take to get a building permit in North Wildwood, NJ?
Building permit processing times in North Wildwood, NJ typically run 2-4 weeks for standard permits; longer for CAFRA-regulated projects. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in North Wildwood, NJ?
Not all construction work requires a permit in North Wildwood, NJ. The following work is generally exempt: Ordinary repairs; Cosmetic improvements; Portable equipment; Small accessory structures; Fences (height restrictions apply). Note: North Wildwood is entirely coastal; flood zone requirements apply to most properties. Verify exemption status with Construction Official. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in North Wildwood, NJ?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in North Wildwood, NJ via: (609) 522-2030, North Wildwood Construction Code Office. 24-48 hours in advance recommended.
last verified April 2026 source North Wildwood Construction Code Office ↗ entry id permits/new-jersey/cape-may/north-wildwood

Educational reference. Permit rules and fees change — confirm current requirements directly with North Wildwood Construction Code Office before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Cape May County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Cape May County jurisdictions →