jaspector
City building permits

Medford Township

How to apply for a building permit in Medford Township, New Jersey. Permit authority, application steps, fees, and inspection requirements.

Code adoption
NJ Uniform Construction Code (UCC)
Min. permit fee
Varies by subcode
Last verified
April 2026
On this page 6
§ 01

Permit authority

Construction Office / Code Enforcement

Street address
17 N. Main Street, Medford, NJ 08055
Coverage
All properties within Medford Township, including Pinelands Commission overlay areas.
Online portal
In-person submission at Township Office
Online forms available; primary submission in-person
§ 02

When a permit is required

Permit triggers and exempt work for Medford Township

A construction permit is required for most work as per NJ Uniform Construction Code (UCC).

Ordinary maintenance work
Minor work as classified by NJ UCC
Emergency work (permit required within 72 hours)
  • Exempt Ordinary maintenance work
  • Exempt Minor work as classified by NJ UCC
  • Exempt Emergency work (permit required within 72 hours)

Note: Pinelands Commission approval required for properties within Pinelands area. All local taxes and assessments must be paid before permit issuance. Confirm edge cases with Code Enforcement before proceeding.

Required documents
  • UCC-F100 Construction Permit Application
  • Building Subcode Technical Section (F110)
  • Electrical Subcode Technical Section (F120)
  • Plumbing Subcode Technical Section (F130)
  • Fire Protection Subcode Technical Section (F140)
  • Mechanical Subcode Technical Section (F145) if applicable
  • Two sets of construction plans
  • Property survey showing lot lines and dimensions
  • Proof of contractor insurance and NJ registration
  • Home Improvement Contractor registration (residential)
Building code
NJ Uniform Construction Code (UCC)
Permit validity
12 months from the date of the most recent inspection per N.J.A.C. 5:23-2.18.
Owner-builder
Owner-builders must comply with NJ UCC requirements and contractor licensing where applicable.
Contractor requirements
Contractors must hold valid NJ licenses, insurance, and be registered as Home Improvement Contractors for residential work.

Source: Construction Office / Code Enforcement ↗

§ 03

Application process

Typical processing: 20 working days for complete applications (unless extended by written agreement).

  1. 01
    Download or obtain NJ DCA UCC forms from township office or website.
  2. 02
    Complete UCC-F100 Construction Permit Application.
  3. 03
    Complete applicable subcode technical sections.
  4. 04
    Submit two sets of plans drawn in ink or blueprint.
  5. 05
    Include property survey by licensed NJ surveyor.
  6. 06
    Provide contractor licenses and registrations.
  7. 07
    Pay fees at time of application.
  8. 08
    Verify Pinelands Commission approval if property is in Pinelands area.
  9. 09
    Submit documents in-person at Township Office.
  10. 10
    Respond to review comments if required.
  11. 11
    Obtain final permit and post on site before construction begins.

Typical processing time: 20 working days for complete applications (unless extended by written agreement).

Source: Construction Office / Code Enforcement ↗

§ 04

Fee schedule

Medford Township building permit fees

Fee type
Amount
01
Minimum permit fee
Varies by subcode
02
Permit fee formula
New Construction: Based on building volume per NJAC 5:23-2.28; Renovations: Based on estimated cost of work.

Proposed utility extensions require Township Engineer review ($500 fee when applicable). Fees paid before permit issuance.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • inspections@medfordtownship.com (email)
  • Construction Office (in-person)
Scheduling deadline
Written request required, submitted at least 24 hours in advance.
Inspection hours
Building and Plumbing: Monday-Friday, 8:30 AM to 2:00 PM; Electrical and Mechanical: Monday-Friday, 8:30 AM to 2:00 PM; Fire Protection: Tuesday and Thursday, 8:30 AM to 12:00 Noon

Typical sequence: Required inspections: Footings (before concrete), Foundation/walls to grade (before backfill), Utility services (including septic), Structural framing/connections/sheathing/insulation, Electrical rough wiring/panel/service, Rough plumbing, HVAC duct systems, Framing inspection, Insulation inspection, Final inspections (all subcodes).

All township inspectors carry photo identification. Minor work classification requires only final inspections.

Source: Construction Office / Code Enforcement ↗

§ 06

Frequently asked

Common questions about Medford Township permits

01 Do I need a building permit in Medford Township, NJ?
A construction permit is required for most work as per NJ Uniform Construction Code (UCC).
02 How much does a building permit cost in Medford Township, NJ?
Building permit fees in Medford Township, NJ are set by the local building department and vary by project type and valuation. The minimum permit fee is Varies by subcode. Fees are calculated as: New Construction: Based on building volume per NJAC 5:23-2.28; Renovations: Based on estimated cost of work..
03 How do I apply for a building permit in Medford Township, NJ?
To apply for a building permit in Medford Township, NJ, follow these steps: 1. Download or obtain NJ DCA UCC forms from township office or website. 2. Complete UCC-F100 Construction Permit Application. 3. Complete applicable subcode technical sections. 4. Submit two sets of plans drawn in ink or blueprint. 5. Include property survey by licensed NJ surveyor. 6. Provide contractor licenses and registrations. 7. Pay fees at time of application. 8. Verify Pinelands Commission approval if property is in Pinelands area. 9. Submit documents in-person at Township Office. 10. Respond to review comments if required. 11. Obtain final permit and post on site before construction begins.
04 How long does it take to get a building permit in Medford Township, NJ?
Building permit processing times in Medford Township, NJ typically run 20 working days for complete applications (unless extended by written agreement).. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Medford Township, NJ?
Not all construction work requires a permit in Medford Township, NJ. The following work is generally exempt: Ordinary maintenance work; Minor work as classified by NJ UCC; Emergency work (permit required within 72 hours). Note: Pinelands Commission approval required for properties within Pinelands area. All local taxes and assessments must be paid before permit issuance. Confirm edge cases with Code Enforcement before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Medford Township, NJ?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Medford Township, NJ via: inspections@medfordtownship.com, Construction Office. Written request required, submitted at least 24 hours in advance..
last verified April 2026 source Construction Office / Code Enforcement ↗ entry id permits/new-jersey/burlington/medford-township

Educational reference. Permit rules and fees change — confirm current requirements directly with Construction Office / Code Enforcement before applying. Jaspector is not legal advice.