On this page 6
When a permit is required
Permit triggers and exempt work for Medford Township
A construction permit is required for most work as per NJ Uniform Construction Code (UCC).
- Exempt Ordinary maintenance work
- Exempt Minor work as classified by NJ UCC
- Exempt Emergency work (permit required within 72 hours)
Note: Pinelands Commission approval required for properties within Pinelands area. All local taxes and assessments must be paid before permit issuance. Confirm edge cases with Code Enforcement before proceeding.
- UCC-F100 Construction Permit Application
- Building Subcode Technical Section (F110)
- Electrical Subcode Technical Section (F120)
- Plumbing Subcode Technical Section (F130)
- Fire Protection Subcode Technical Section (F140)
- Mechanical Subcode Technical Section (F145) if applicable
- Two sets of construction plans
- Property survey showing lot lines and dimensions
- Proof of contractor insurance and NJ registration
- Home Improvement Contractor registration (residential)
- Building code
- NJ Uniform Construction Code (UCC)
- Permit validity
- 12 months from the date of the most recent inspection per N.J.A.C. 5:23-2.18.
- Owner-builder
- Owner-builders must comply with NJ UCC requirements and contractor licensing where applicable.
- Contractor requirements
- Contractors must hold valid NJ licenses, insurance, and be registered as Home Improvement Contractors for residential work.
Application process
Typical processing: 20 working days for complete applications (unless extended by written agreement).
- 01 Download or obtain NJ DCA UCC forms from township office or website.
- 02 Complete UCC-F100 Construction Permit Application.
- 03 Complete applicable subcode technical sections.
- 04 Submit two sets of plans drawn in ink or blueprint.
- 05 Include property survey by licensed NJ surveyor.
- 06 Provide contractor licenses and registrations.
- 07 Pay fees at time of application.
- 08 Verify Pinelands Commission approval if property is in Pinelands area.
- 09 Submit documents in-person at Township Office.
- 10 Respond to review comments if required.
- 11 Obtain final permit and post on site before construction begins.
Typical processing time: 20 working days for complete applications (unless extended by written agreement).
Fee schedule
Medford Township building permit fees
Proposed utility extensions require Township Engineer review ($500 fee when applicable). Fees paid before permit issuance.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- inspections@medfordtownship.com (email)
- Construction Office (in-person)
- Scheduling deadline
- Written request required, submitted at least 24 hours in advance.
- Inspection hours
- Building and Plumbing: Monday-Friday, 8:30 AM to 2:00 PM; Electrical and Mechanical: Monday-Friday, 8:30 AM to 2:00 PM; Fire Protection: Tuesday and Thursday, 8:30 AM to 12:00 Noon
Typical sequence: Required inspections: Footings (before concrete), Foundation/walls to grade (before backfill), Utility services (including septic), Structural framing/connections/sheathing/insulation, Electrical rough wiring/panel/service, Rough plumbing, HVAC duct systems, Framing inspection, Insulation inspection, Final inspections (all subcodes).
All township inspectors carry photo identification. Minor work classification requires only final inspections.
Frequently asked
Common questions about Medford Township permits
01 Do I need a building permit in Medford Township, NJ? ▸
02 How much does a building permit cost in Medford Township, NJ? ▸
03 How do I apply for a building permit in Medford Township, NJ? ▸
04 How long does it take to get a building permit in Medford Township, NJ? ▸
05 What work is exempt from building permits in Medford Township, NJ? ▸
06 How do I schedule a building inspection in Medford Township, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Construction Office / Code Enforcement before applying. Jaspector is not legal advice.