When a permit is required
Permit triggers and exempt work for Burlington Township
A construction permit is required for most work as per NJ Uniform Construction Code (UCC).
- Exempt Ordinary repairs not involving code violations
- Exempt Minor work as determined by subcode official and Construction Code Official
- Exempt Emergency work (permit required within 72 hours)
- Exempt Cosmetic repairs
- Exempt Non-structural maintenance
Note: Zoning approval may be required before construction permit issuance. All taxes and assessments must be current. Site plan approval may be required for certain projects.
- UCC-F100 Construction Permit Application
- Applicable subcode technical sections
- Three sets of construction plans
- Property survey or site plan
- Contractor proof of insurance and NJ licenses
- Home Improvement Contractor registration (residential)
- Building code
- NJ Uniform Construction Code (UCC)
- Permit validity
- 12 months from most recent inspection.
- Owner-builder
- Owner-builders must comply with NJ UCC requirements and contractor licensing where applicable.
- Contractor requirements
- Contractors must hold valid NJ licenses, insurance, and be registered as Home Improvement Contractors for residential work.
Application process
Typical processing: Varies by project complexity; typically 2-4 weeks for plan review.
- 01 Visit Department of Licensing and Inspection to obtain application packet.
- 02 Complete NJ DCA UCC-F100 Construction Permit Application.
- 03 Submit three sets of plans for plan review.
- 04 Include site plan, construction drawings, specifications.
- 05 Provide contractor licenses and insurance certificates.
- 06 Pay plan review fee before review begins (25% of construction permit fee).
- 07 Submit documents in-person at Municipal Building.
- 08 Respond to plan review comments if required.
- 09 Pay remaining permit fees upon approval.
- 10 Obtain final permit and post on site before construction begins.
Typical processing time: Varies by project complexity; typically 2-4 weeks for plan review.
Fee schedule
Burlington Township building permit fees
State Training Surcharge: $0.00371 per cubic foot (new construction) or $1.90 per $1,000 of value ($1 minimum). Plan review amount credited toward construction permit fee.
Required inspections
Scheduling and sequence
- (609) 239-6412 (phone)
- Department of Licensing and Inspection (in-person)
- Scheduling deadline
- Contact Department of Licensing and Inspection.
- Inspection hours
- Monday-Friday (contact for specific hours).
Typical sequence: Standard inspections: Footings (before concrete), Foundation/walls to grade (before backfill), Utility services, Rough inspections (all subcodes), Framing inspection, Insulation inspection, Final inspections (all subcodes).
Frequently asked
Common questions about Burlington Township permits
01 Do I need a building permit in Burlington Township, NJ? ▸
02 How much does a building permit cost in Burlington Township, NJ? ▸
03 How do I apply for a building permit in Burlington Township, NJ? ▸
04 How long does it take to get a building permit in Burlington Township, NJ? ▸
05 What work is exempt from building permits in Burlington Township, NJ? ▸
06 How do I schedule a building inspection in Burlington Township, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Department of Licensing and Inspection before applying. Jaspector is not legal advice.